Alvarado Transportation Center
Albuquerque, New Mexico
The Alvarado Transportation Center has been designed to function as a transportation center that includes administrative offices for the City of Albuquerque Transit Department. The operation of the facility is anticipated to improve transit service to the Downtown area, aid in congestion management efforts and provide efficient passenger interchange among various modes of transportation, including City transit, intercity rail, intercity motorcoach, taxi services, and potential light rail transit. The Transit Department has worked with Greyhound and Amtrak to ensure that the facility meets their required operational criteria. While providing for current and future transportation needs, the Alvarado Transportation Center is helping to create an historical “feel” for the Downtown. The facility has been designed in the style of the former Alvarado Hotel (circa 1900), one of the “gems” of the Fred Harvey-Atchinson, Topeka and Santa Fe string of first class resort hotels. Three buildings that are eligible for the national register will be functionally incorporated into the site layout. Funds for the project were provided by FTA, City of Albuquerque, State of New Mexico and the Albuquerque Development Commission. The project is currently scheduled to be operational in July 2001.
Greater Albuquerque Mass Transit Project
Albuquerque, New Mexico
The City of Albuquerque’s Transit Department, in coordination with New Mexico’s Highway and Transportation Department, and the Middle Rio Grande Council of Governments, has undertaken a High Capacity Transportation System (HCTS) Study. The Albuquerque Metropolitan Planning Area is forecasted to have a 48 percent increase in population by 2020. Accordingly, in order to maintain the area’s attractiveness for residents and economic development, a combination of transportation improvements is under examination. Planning for the proposed HCTS will be completed in two phases. Phase I will develop a 20-year high capacity-strategic corridors plan. Phase I will be completed in November 2000. Phase II will include the environmental document for the approved corridor(s). The Draft Environmental Impact Statement is anticipated for completion in December 2002. Alternatives that are being studied include: No-build, roadway improvements, new roadways, Travel Demand Management/Transportation System Management (TDM/TSM), including Intelligent Transportation System (ITS) applications, bus service improvements, express bus and park-and-ride service, High Occupancy Vehicle (HOV) lanes, busways, commuter rail, light rail and a combination of modes. High capacity-strategic corridors will be incorporated into the region’s Metropolitan Transportation Plan. Through FY 2001, Congress has appropriated $12.30 million in Section 5309 New Starts funds for this effort.
High Capacity Corridor Light Rail
Albuquerque, New Mexico
See the description for the Greater Albuquerque Mass Transit Project. Project sponsors have informed FTA that the two are the same.
Atlanta-Athens Commuter Rail
Atlanta-Athens, Georgia
The Georgia Rail Passenger Authority (GRPA) is conducting a Major Investment Study (MIS) to examine the feasibility of various transportation improvements in the 70-mile transportation corridor between downtown Atlanta and downtown Athens, Georgia. The options under evaluation include the no-build option, Transportation Systems Management (TSM) options, including commuter bus service on existing roads, and commuter rail service on the existing CSX line between Athens and Atlanta. The GRPA has submitted a preliminary draft of the MIS for review by the Federal agencies, the Georgia Department of Transportation (GDOT), the Atlanta Regional Commission (ARC), the Athens-Clarke Metropolitan Planning Organization, and the transit operators in the Atlanta and Athens areas. An additional analysis of ridership, capital and operating costs and financing will be conducted as part of the MIS. In addition, study sponsors are working with CSX to address unresolved issues on the use of CSX right-of-way in the proposed corridor.
Griffin Commuter Rail
Atlanta-Griffin-Macon, Georgia
The Georgia Rail Passenger Authority (GRPA), in coordination with the Georgia Department of Transportation (GDOT), is advancing the 1997 Intercity Rail Plan with its program of combined intercity/commuter rail service in North and Middle Georgia. The plan calls for commuter rail service to Griffin and intercity services beyond to Macon, Georgia. The proposed line will serve seven counties (Bibb, Monroe, Lamar, Spalding, Henry, Clayton, and Fulton) as well as numerous communities along the way. The GRPA has undertaken a study to update the 1997 GDOT Intercity Rail Plan in preparation for completing a Major Investment Study (MIS) in the corridor. Plans for the initial service outline the utilization of over 102 miles of an existing Norfolk Southern commercial freight line. Total capital costs for the initiation of service from Atlanta-to-Griffin-to-Macon are estimated at $163.12 million. The Georgia General Assembly has appropriated approximately $4 million to continue with the MIS and follow-up activities.
Georgia 400 Multimodal Corridor (North Fulton Corridor)
Atlanta, Georgia
The Metropolitan Atlanta Rapid Transit Authority (MARTA) is conducting a feasibility study to examine transit options in a proposed 14-mile corridor extending from the North Springs Station (currently completing construction) to McGinnis Ferry Parkway along the Georgia 400 corridor. High growth in office, commercial, and residential development has occurred within the corridor with additional significant growth already planned.
MARTA - Interstate 285 Transit Corridor
Atlanta, Georgia
The Metropolitan Atlanta Rapid Transit Authority (MARTA) is conducting a feasibility study to examine transit infrastructure options within the Interstate 285 Corridor extending from the existing Kensington Rail Station in DeKalb County to the Medical Center Station and Perimeter Center area. The proposed corridor is highly congested and currently carries over 170,000 daily auto trips.
MARTA - Marietta-Lawrenceville Corridor
Atlanta, Georgia
FTA has not received any information on this effort.
MARTA - South DeKalb Comprehensive Transit Program
Atlanta, Georgia
The Metropolitan Atlanta Rapid Transit Authority (MARTA) is examining potential transit solutions to alleviate traffic congestion throughout South DeKalb County. The proposed area, located south of MARTA’s existing East Line is currently experiencing rapid growth in residential development. The result has been heavy traffic congestion on all major streets and highways. A portion of the proposed study area was included in the South DeKalb-Lindbergh Corridor Major Investment Study (MIS). As a result, data collected from the South DeKalb-Lindbergh MIS will be incorporated into the South DeKalb Comprehensive Transit Study.
Atlanta (South DeKalb – Lindbergh Corridor)
Atlanta, Georgia
The Metropolitan Atlanta Rapid Transit Authority (MARTA) is conducting a Major Investment Study (MIS) to examine transportation options in a proposed 15-mile corridor extending from the South campus of the Georgia Perimeter College, north to the Emory University area. The proposed corridor also includes the Centers for Disease Control and medical center complex, and continues on to the existing Lindbergh Center Station on MARTA’s North Line. Through FY 2001, Congress has appropriated $3.63 million in Section 5309 New Starts funds for this effort.
Central LRT Extension to Glen Burnie
Baltimore, Maryland
The Maryland Mass Transit Administration (MTA) has decided not to pursue this effort at this time. The most cost-effective alignment is not acceptable to the public or locally elected officials.
MARC – Commuter Rail Improvements
(MARC Maintenance Facility)
Baltimore, Maryland-Washington, D.C.
The Mass Transit Administration of the Maryland Department of Transportation (MD DOT) is conducting preliminary engineering and an environmental analysis study for the Maryland Commuter Rail (MARC) maintenance facility. A preferred site has been selected at Mt. Clare in southwest Baltimore City, located along the MARC Penn-Camden Connection. The study is one of several recommendations resulting from the MARC Master Plan completed in 1995. The purpose of the study is to design and build a storage and centralized maintenance facility for the MARC system. Currently, maintenance activities are performed in multiple facilities owned and operated by Amtrak and CSXT in the Baltimore and Washington metropolitan area. MD DOT funded the first phase of the project.
Metropolitan Rail Corridor
Baltimore, Maryland
The Maryland Department of Transportation (MD DOT) is currently considering 17 transportation improvement options for the Baltimore-Washington, D.C. metropolitan region. The various projects under study for the region range in scope from a two-mile extension for a Baltimore-Washington International Airport Square light rail transit (LRT) line and a downtown Baltimore LRT “Loop” to a 19-mile Metro (heavy rail) extension between Columbia and Silver Spring, Maryland. Total capital costs for the various options range between $120 million (downtown Baltimore Loop) to $1.9 billion (Baltimore Metro options to White Marsh Mall or Westminster).
People Mover (Central Downtown Study)
Baltimore, Maryland
The City of Baltimore has initiated a feasibility study to identify transportation improvements within the Baltimore Downtown area. The study area includes an east-west corridor that also encompasses the Inner Harbor. The study will examine transportation options for moving people in the downtown area to areas just east and west of the Harbor. Alternatives under consideration include, but are not limited to, a potential light rail transit extension from the current Penn Station and a people mover. Through FY 2001, Congress has appropriated $0.49 million in Section 5309 New Starts funds for this effort.
Cross County Light Rail
Bergen County, New Jersey
The Bergen County, New Jersey, Cross County Light Rail Transit (LRT) line was recommended as one of three new rail lines under the West Shore Major Investment Study/Draft Environmental Impact Statement. The proposed Cross County LRT is anticipated to share the right-of-way of the New York, Susquehanna and Western Railroad southeast from Maywood (possibly Paterson) New Jersey, through the City of Hackensack and terminate at the Vince Lombardi park-and-ride lot, a distance of approximately seven miles. A second track and passing sidings for the LRT would be constructed in the right-of-way and would be separate from the current freight service. Potential stations include Maywood/Rochelle Park, Hackensack (Prospect Avenue), Hackensack (Main Street) and Bogota. The Vince Lombardi park-and-ride lot will be the terminus point for the Hudson-Bergen LRT (HBLRT). The first Minimum Operable Segment of the HBLRT began revenue operations in April 2000. The proposed Cross County Line would serve as an extension to the HBLRT. The HBLRT track and structures could be used for the operation of service from Hoboken to the Vince Lombardi park-and-ride lot in North Bergen. This would allow a one-seat ride from Hoboken to Maywood, a distance of 17 miles. An Environmental Impact Statement is scheduled for completion within the next two years.
Transit Corridor
Birmingham, Alabama
The Birmingham Metropolitan Planning Organization (MPO) completed a Regional Transit Feasibility Analysis as part of the Strategic Regional Multi-modal Mobility Plan (Plan) in November 1999. The overall Plan includes a congestion management system element and a feasibility determination for regional transportation and transit improvements for the Birmingham Metropolitan Planning Area of Jefferson and Shelby Counties. In the Phase I regional transportation and investment planning process, the transportation alternatives that were identified included highway improvements, high-occupancy vehicle (HOV) lanes, improved fixed-route transit service, circulator and feeder bus service, express bus service operating from park-and-ride lots on HOV lanes and light rail transit. The conclusions from the Phase I effort included, among other findings, the need to address long-term dedicated public transit funding and land development policies. The Birmingham MPO, representing local municipal and county governments, in cooperation with the Birmingham-Jefferson County Transit Authority, will conduct Phase II. Phase II will identify the locally preferred alternative in each corridor in accordance with FTA’s regulations for Major Capital Investment Projects. Phase II is scheduled for completion in FY 2002. Through FY 2001, Congress has appropriated $8.88 million in Section 5309 New Starts funds for this effort.
Airport Intermodal Transit Connector
Boston, Massachusetts
The Massachusetts Port Authority (Massport), in coordination with the Massachusetts Bay Transportation Authority (MBTA), conducted a Major Investment Study/Draft Environmental Impact Statement (MIS/DEIS) on transportation improvements to enhance the intermodal connection between Logan International Airport and the Boston regional transit system and ease airport roadway and curb congestion. The study included bus as well as people mover alternatives. During the MIS process, Massport determined that improvements to the bus system at Logan Airport and the addition of bus service to South Station would be more cost-effective than a people mover. Massport suspended work on the MIS/DEIS and further developed the bus alternative now known as the Airport Intermodal Transit Connector (AITC) under an Environmental Assessment (EA). The project involves two routes: one connecting South Station in Boston to the airport via the South Boston Piers Transitway and the new Ted Williams Tunnel (Central Artery) and the second connecting the MBTA’s Blue Line to airport terminals. Massport will operate dual mode buses (electric trolley/diesel) on the South Station to Logan Airport route and alternative fueled buses on the Blue Line/Terminals route. FTA has approved the EA for the AITC and Massport is now prepared to move ahead with the project, which is programmed in the Massachusetts State Transportation Improvement Program and Boston Transportation Improvement Program. FTA has approved a $12.6 million Letter of No Prejudice request by Massport to incur costs for the procurement of eight low-floor buses to provide service from Logan Airport to South Station.
Boston-Providence Commuter Rail/Pawtucket Layover Facility
Boston, Massachusetts-Providence, Rhode Island
The proposed project involves the construction of a commuter rail layover facility in Pawtucket, Rhode Island. The project is a joint Rhode Island Department of Transportation/Massachusetts Bay Transportation Authority (RIDOT/MBTA) venture for the design and construction of six-to-nine track commuter rail yard for the purpose of overnight layover/storage and future light maintenance of commuter rail equipment. The project would serve the existing Providence-Boston service on Rhode Island’s future Providence-Westerly service. The twelve-acre parcel is situated adjacent to the east of the Amtrak Main Line. As part of the existing agreement with the MBTA, RIDOT will fund the design and construction of the yard in exchange for ten years of commuter rail service to the Providence Station. Total capital costs are estimated at $10 million. The project is included in Rhode Island’s Transportation Plan, and Transportation Improvement Program. Through FY 2001, Congress has appropriated $0.49 million in Section 5309 New Starts funds for this effort.
North Shore Corridor Project
Boston, Massachusetts
The Massachusetts Bay Transportation Authority (MBTA) has previously conducted a series of feasibility studies for improvements to the North Shore transportation system. These studies evaluated extensions of the Blue Line; improved commuter rail and express bus services; and the connection of the Blue Line and North Shore commuter rail service in Revere. Area officials now intend to further evaluate these alternatives with a comprehensive, corridor-wide analysis with an extensive public outreach effort. The study will build on previous work and focus on operational impacts to the MBTA system, ridership analysis, capital and operating costs, community impacts, environmental impacts and cost/benefit analyses. This project is in the local Metropolitan Planning Organization’s Unified Planning Work Program, but is not in the Boston area Long-Range Transportation Plan. Through FY 2001, Congress has appropriated $2.98 million in Section 5309 New Starts funds for this effort.
North-South Rail Link
Boston, Massachusetts
The Massachusetts Bay Transportation Authority (MBTA) is conducting a Major Investment Study/Draft Environmental Impact Statement (MIS/DEIS) to examine transit options in the corridor between North Station and South Station in downtown Boston. The alternatives under consideration include a bus shuttle system as a transportation systems management (TSM) option and various configurations of a rail tunnel. The tunnel would be constructed under the Central Artery alignment and would permit through commuter rail transit to serve both downtown stations. Currently, MBTA commuter rail service is split into two completely separate services, one serving the North Station and the other serving the South Station. The project is included in the “future projects” section of the Boston area Long-Range Transportation Plan, but is not in the financially constrained plan. Through FY 2001, Congress has appropriated $0.49 million in Section 5309 New Starts funds for this effort.
South Boston Piers Transitway – Phase II
Boston, Massachusetts
In February 1993, the Massachusetts Bay Transportation Authority (MBTA) completed an alternative analysis and selected a 1.5-mile underground transit tunnel from the Boylston Station to the World Trade Center, combined with surface bus operations as the locally preferred alternative. The alternative, referred to as the Full Build Transitway, is proposed for construction in two phases. Phase I will connect South Station – which is the terminus of the MBTA’s south side commuter rail operations and Amtrak’s Northeast Corridor service, a major bus station and a station on the MBTA’s Red Rapid Transit Line – to the World Trade Center in the Piers area. Dual mode trackless trolleys will operate in the Transitway Tunnel and on limited surface routes in the eastern end of the Piers area and to Logan International Airport. The Final Environmental Impact Statement was completed in December 1993. FTA issued a Record of Decision in May 1994 for the Full Build Transitway. In 1994, FTA signed a Full Funding Grant Agreement with the MBTA for $330.73 million, including a contingent commitment of $53 million, for Phase I of the Transitway. Phase I is currently under construction and is scheduled to commence revenue operations in December 2003. Through FY 2001, Congress has appropriated $319.57 million in Section 5309 New Starts funds for Phase I. Phase II would extend the Transitway underground from South Station to Chinatown Station on the Orange Line and Boylston Station on the Green Line, a distance of approximately one-half mile. Phase II is estimated to cost $363.7 million ($1996). The MBTA is proposing to combine the South Boston Piers Transitway project and the locally funded Washington Street Replacement as one overall bus rapid transit project known as the “Silver Line.” By linking the Transitway and Washington Street projects at the Bolyston Street Station, the Silver Line is expected to improve transit service for Roxbury, South End and Chinatown neighborhoods to the downtown financial district, new development in the South Boston Seaport District, including the Boston Convention and Exhibition Center and Logan International Airport.
Urban Ring
Boston, Massachusetts
The Massachusetts Bay Transportation Authority (MBTA) is conducting a Major Investment Study (MIS) to examine transportation alternatives to improve circumferential mass transit in a corridor surrounding the Boston central core. The proposed corridor, known as the Urban Ring and generally following a previously proposed inner belt highway alignment, includes regional trip generators, beginning at the University of Massachusetts’ Boston Campus at the southeast end and terminating at Logan Airport at the northeast end. The corridor also includes many major public, private, and institutional activity centers located in Boston, Cambridge, Chelsea, Everett, Somerville, and Brookline. Currently, the alternatives under consideration include circumferential rail service, various combinations of rail and bus service to new station stops on the existing radial system, and enhanced bus service. These alternatives would connect with extant commuter rail and transit lines. The project is included in the “future projects” section of the Boston area Long-Range Transportation Plan, but is not in the financially constrained plan. Through FY 2001, Congress has appropriated $4.8 million in Section 5309 New Starts funds for this effort.
Intermodal Corridor
Bridgeport, Connecticut
The proposed effort involves the construction of a $34 million multi-phased Intermodal Transportation Center in downtown Bridgeport. In order to complete this facility, the City proposes to fund this effort in two phases: Phase I - $14 million parking garage; and Phase II - $20 million bus facility. Through FY 2001, Congress has appropriated $5.6 million in Section 5309 Bus funds for Phase I of this project.
Burlington-Essex Commuter Rail
Burlington, Vermont
The Vermont Agency of Transportation (VAOT) is planning an extension of commuter rail service on 7.8 miles of existing right-of-way between Burlington and Essex Junction. This is Phase II of the VAOT Burlington Commuter Rail effort. The proposed project will extend the Burlington to Charlotte commuter rail service from the recently renovated Union Station in Burlington to connect with Amtrak and major employment centers in Essex Junction. The Burlington to Charlotte commuter rail service is scheduled to begin operation in FY 2000. The VAOT has prepared a corridor analysis for the proposed project with $0.26 million from their $4.98 million FY 1998 earmark. The Metropolitan Planning Organization (MPO) anticipates that additional analysis will be required prior to requesting permission to commence preliminary engineering. This analysis is currently under review by the MPO for incorporation into the Transportation Improvement Program. The improvements in the corridor would include track, tunnel, signal, at-grade crossings and drainage improvements. Two intermediate stations are also being considered along this route. Through FY 2001, Congress has appropriated $6.96 million in Section 5309 New Starts funds for this effort.
Canton-Akron-Cleveland Interregional Travel Corridor Study
Canton-Akron-Cleveland, Ohio
The METRO Regional Transit Authority (METRO), in cooperation with local metropolitan planning organizations, regional transit authorities, and the Ohio Department of Transportation, is conducting a Major Investment Study (MIS) to assess the costs and benefits of new passenger rail service, Transportation System Management (TSM), and/or capacity improvements for the Canton-Akron-Cleveland (CAC) Corridor. The proposed 62-mile corridor follows a path along Interstate 77 (I-77) between Canton and Akron. Between Akron and Cleveland, the corridor widens to include both I-77 and State Route 8 (SR-8). The SR-8 alignment utilizes I-271 and I-480, returning to I-77 then into the Central Business District of Cleveland. The corridor frequently experiences traffic congestion and related safety problems on major transportation facilities. The study is currently in the alternative definition stage. Light rail Transit (LRT) is being evaluated along two separate alignments. One route generally follows I-77 for 25 miles from Richfield in Northern Summit County into downtown Cleveland. The second LRT route starts near the intersection of I-271 and SR-8 and continues for approximately 25 miles into the Cleveland CBD. In addition, two commuter rail routes, using existing rail rights-of-way are being examined. Lastly, a number of highway improvements and possible widenings are also being evaluated. The proposed project is included in the Akron Metropolitan Area Transportation Study’s Long-Range Needs Plan. To date, METRO has purchased and preserved about 43 miles of rail right-of-way for future passenger use. The MIS is scheduled for completion in June 2001. Through FY 2001, Congress has appropriated $16.38 million in Section 5309 New Starts funds for this effort.
Monobeam Corridor
Charleston, South Carolina
The Charleston Area Regional Transportation Authority, in cooperation with the City of Charleston and the City of North Charleston, is examining the feasibility of implementing a proposed monobeam transit system from the Airport to the Convention Center. The proposed full-scale monobeam prototype is a three-year $35-$40 million effort that is expected to be financed largely with private funds. An approximately 1.25-mile prototype will be erected on a site in the Charleston community and is designed to demonstrate the aesthetic, cost and environmental characteristics of the monobeam, as well as its safety and reliability. The prototype could become the first segment of a regional rail transit network. Through FY 2001, Congress has appropriated $6.13 million in Section 5309 New Starts for this effort.
35th Street Station (also known as the Comiskey Park Station)
Chicago, Illinois
Metra, the commuter rail agency for northeastern Illinois, initiated a review of the relative merits of developing a proposed commuter rail station at 35th Street, located near Comiskey Park in Chicago. The preferred location would allow commuters to transfer to two Chicago Transit Authority rapid transit lines. Metra’s analysis will be released following the completion of a State-funded study being conducted by the Regional Transportation Authority (RTA) of northeastern Illinois. The study will examine the feasibility of improving integration of service and fares of all the transit services provided by the RTA.
Inner Circumferential Commuter Rail
Chicago, Illinois
Metra, the commuter rail agency for northeastern Illinois, has completed the first phase of a study examining the feasibility of implementing commuter rail service in the corridor between O’Hare and Midway airports. An effort to secure local funds to initiate additional studies is also underway. The Chicago Area Transportation Study (local metropolitan planning organization) has not included this effort in its Long-Range Transportation Plan, although it identifies it as one of twenty corridors for further study.
McCormick Place Busway
Chicago, Illinois
The City of Chicago is proposing to design and construct the Lakefront Busway project. The proposed project consists of a two-lane, two-way bus road to shuttle McCormick Place attendees between the convention center to Randolph Street and hotels to the north.
The proposed roadway, which would be separate from general traffic in and adjacent to Grant Park, is anticipated to allow faster trips to and from McCormick Place, and thereby reduce the convention center’s transportation costs, and traffic congestion. The project is being funded by the Metropolitan Pier and Exposition Authority, and is currently in the design and right-of-way acquisition stage. Substantial completion of the project is scheduled in late 2000. No Federal Section 5309 New Starts funds are being sought for the project.
Northwest Ral Transit Corridor
Chicago, Illinois
The Regional Transportation Authority of northeastern Illinois is conducting a feasibility study to investigate the transit and transportation needs of the Interstate 90/Northwest Tollway Corridor. The study is evaluating a range of transportation options that will result in a set of viable, cost-effective alternatives for the proposed corridor. The Northwest Corridor Transit Feasibility Study (I-90/Northwest Tollway Corridor) area is bounded by Harlem Avenue on the east, the Kane/Cook County line on the west, Metra’s (commuter rail agency for northeastern Illinois) Union-Pacific Northwest Line on the north and Metra’s Milwaukee West Line on the south. A final set of alternatives were identified and evaluated more extensively. However, before a final alternative is selected, a second level of study will be necessary to further refine the details.
Berea/I-X Center Red Line Extension
Cleveland, Ohio
The Greater Cleveland Regional Transit Authority (GCRTA) is conducting a Major Investment Study/Draft Environmental Impact Statement (MIS/DEIS) to determine transportation options to provide a direct link between downtown Cleveland, Hopkins International Airport, the International Exposition (I-X) Center, and Baldwin Wallace College. The proposed Berea Rapid Transit Extension, extending approximately three to four miles from the GCRTA’s Airport station, is directly aligned with the local transit operator’s Red Line rapid rail system. The MIS/DEIS is also considering adequate walk-up access and park-n-ride facilities to encourage more usage of the Red Line Light Rail Transit System. The Berea Rapid Transit Extension MIS was programmed in the Northeast Ohio Areawide Coordinating Agency’s (NOACA) - (local metropolitan planning organization) FY 1997 Unified Work Program. A decision on a Locally Preferred Alternative has not been made by GCRTA at this time. Through FY 2001, Congress has appropriated $2.9 million in Section 5309 New Starts funds for this effort.
Blue Line Extension
Cleveland, Ohio
The Greater Cleveland Regional Transit Authority (GCRTA) is conducting a Major Investment Study to examine transportation options in a corridor extending from the terminus of GCRTA’s Blue Line at the intersection of Van Aken Boulevard and Warrensville Road in Shaker Heights. Among the alternatives being considered is a potential extension of the Blue Line to an area near the planned interchange on Interstate 271 at Harvard Road near Beachwood that is being built to serve the new Chagrin Highlands development. A joint economic development agreement between the City of Cleveland, a private developer and area suburbs, will develop over 650 acres of unused land for the Chagrin Highlands complex over the next 20 years. The master plan projects approximately 3.5 million square feet of office space, 1,000 hotel rooms, 250,000 square feet of shops and restaurants and over 15,000 jobs. The MIS is also being coordinated with major plans for new developments, including Highland Hills’ Cleveland Enterprise Park and the City of Shaker Heights’ Warrensville/Van Aken shopping center redevelopment at the current Blue Line terminus. Through FY 2001, Congress has appropriated $0.8 million in Section 5309 New Starts funds for this effort.
Interstate 90 Corridor to Ashtabula County
Cleveland, Ohio
See the description for the Northeast Ohio Commuter Rail Feasibility Study. Study sponsors have informed FTA that the two are the same.
Lorain-Cleveland Commuter Rail
Cleveland, Ohio
See the description for the Northeast Ohio Commuter Rail Feasibility Study. Study sponsors have informed FTA that the two are the same.
Northeast Ohio Commuter Rail Feasibility Study, Phase II
Cleveland, Ohio
The Northeast Ohio Areawide Coordinating Agency (NOACA), the local Metropolitan Planning Organization for the Cleveland area, is examining the feasibility of initiating commuter rail service in the Cleveland metropolitan area. Phase I of the Northeast Ohio Rail Feasibility Study was completed by NOACA. Seven corridors were identified in Phase I as being potentially feasible for commuter rail service. Phase II will bring the analysis of commuter rail in northeast Ohio to a conclusion, providing regional decision makers with information necessary to select, program and fund potential commuter rail service. Completion of Phase II is anticipated during the year 2001.
North – South Corridor (Waterfront Line Extension)
Cleveland, Ohio
The Greater Cleveland Regional Transit Authority (GCRTA) is conducting a Major Investment Study to examine transportation options to the North-South transportation corridor in the eastern portion of the Central Business District (CBD) in Cleveland, Ohio. One option under consideration includes providing light rail transit (LRT) service to the proposed corridor. The alternatives under study could potentially provide rail service to an emerging office corridor, Cleveland’s theater district, and two local colleges, while creating a downtown rail loop. Accordingly, one of the alternatives under consideration includes a potential extension of the Waterfront Line LRT south from the existing North Coast terminus through the eastern portion of the CBD. Alternatives under examination could also provide a North-South rail connection to the proposed Euclid Corridor bus rapid transit project. Through FY 2001, Congress has appropriated $0.99 million in Section 5309 New Starts funds for this effort.
Hollis-Ketchikan Ferry
Craig, Alaska
Residents of the State of Alaska rely on ferries to connect many of the State’s coastal islands and towns. The State operates the Alaska Marine Highway, a system of 17 vessels, in the southeast and south central portions of the State. The system has limited funding availability and has been unable to introduce additional services and routes. The City of Craig combined with other communities on Prince of Wales Island to evaluate the feasibility of replacing a ferry service operated by the Alaska Marine Highway between the island and the City of Ketchikan with more frequent and reliable service. The vessel is currently under construction and is anticipated for completion (in time for service initiation) during the year 2001. The Inter-Island Ferry Authority is the grant recipient. Through FY 2001, Congress has appropriated $6.3 million in Section 5309 New Starts funds for this effort.
Dallas (Northwest Corridor LRT)
Dallas, Texas
The Dallas Area Rapid Transit (DART) system completed a Major Investment Study for the Northwest Corridor in March 2000. The locally preferred alternative (LPA) recommended light rail transit (LRT) for an 18-mile corridor extending from the Dallas central business district to Frankford Road in the City of Carrollton. The Regional Transportation Council, the local Metropolitan Planning Organization for the Dallas-Ft. Worth metropolitan area, adopted the LPA in the region’s long-range transportation plan in January 2000. The Northwest Corridor LRT is part of the third phase of implementing the DART Transit System Plan. The project would link an area encompassing approximately one-quarter of DART’s service area to the DART LRT system. Major activity centers along the corridor include a new professional sports arena, Market Center convention and office area, Medical Center complexes, Dallas Love Field Airport, major redevelopment projects in northwest Dallas and the two rapidly growing suburban cities of Farmers Branch and Carrollton. The planned double-track alignment for the proposed LRT would consist of a mix of at-, above- and below-grade trackage, in addition to exclusive lanes within roadway right-of-way. Eleven stations are proposed, of which nine would have a combined total of 1,600 parking spaces. All stations would have transfers to DART’s bus system, and others would offer transfers to intercity bus, commuter rail or Love Field Airport.
Dallas (Southeast Corridor LRT)
Dallas, Texas
In March 2000, the Dallas Area Rapid Transit system completed a Major Investment Study, with the selection of a locally preferred alternative (LPA) that recommended light rail transit (LRT) for a 10-mile corridor connecting the Dallas central business district to the Southeast portion of the City of Dallas and southern Dallas County. The Regional Transportation Council, the local Metropolitan Planning Organization for the Dallas-Ft. Worth metropolitan area, adopted the LPA in the region’s long-range transportation plan in January 2000. The Southeast Corridor LRT is part of the third phase of implementing the DART Transit System Plan. The Southeast Corridor is an area generally connecting downtown Dallas with several southern communities, including Deep Ellum, Baylor Hospital, South Dallas, Fair Park, Buckner Terrace and Pleasant Grove. The proposed project would utilize portions of abandoned railroad right-of-way as well as sections of on-street alignment. The project also would include the construction of nine stations and procurement of 19 light rail vehicles. Six of the nine proposed stations would provide park-and-ride facilities, totaling approximately 2,000 parking spaces. Two of the proposed stations would also serve as intermodal facilities. Feeder bus service, roadway improvements and traffic calming improvements are also planned to complement the proposed LRT. The Southeast Corridor LRT, similar to DART’s original 20-mile starter system, is contained entirely within the Dallas city limits. Through FY 2001, Congress has appropriated $0.99 million in Section 5309 New Starts funds for this effort.
Regional Riverfront Corridor
Dayton, Ohio
The City of Dayton, in cooperation with the Miami Valley Regional Transportation Authority (Miami Valley RTA) is proposing to revitalize the area along the Miami River in downtown Dayton. The proposed riverfront corridor revitalization effort includes a landscaped walkway, a plaza for community festivals, fountains, a small boat harbor and the redevelopment of an existing street into a pedestrian way lined with trees, benches and streetlights. In accordance with this, the City of Dayton, along with the Miami Valley RTA is also proposing to relocate the existing infrastructure of an electric trolley for one of Miami Valley RTA’s electric trolley bus lines. In addition, the proposed project includes the construction of pedestrian access facilities, bus shelters, benches and signage.
East Corridor (Airport)
Denver, Colorado
The Denver Regional Council of Governments (DRCOG), in cooperation with the Colorado Department of Transportation (CDOT) and the Regional Transit District (RTD), has completed the technical work for a Major Investment Study (MIS) to evaluate transportation improvements in its East Corridor, which links downtown Denver via Interstate 70 with Denver International Airport (DIA). The East Corridor MIS was coordinated with concurrent Major Investment Studies of the region’s West and Southeast Corridors. The East Corridor MIS recommended a multimodal package of improvements in the corridor including a 23-mile single-track commuter rail line between Denver Union Station and DIA and a one-mile light rail extension from downtown to connect with the commuter rail at East 40th Avenue and 40th Street. With the commuter and light rail improvements, DRCOG estimates an increase of 8,800 daily linked transit trips in the corridor by the year 2020. The capital cost estimate of the commuter and light rail improvements is $330 million, with annual operating costs estimated at $31.2 million. DRCOG has officially adopted this locally preferred alternative by including it in the Long-Range Transportation Plan. The RTD Board has authorized the General Manager to begin the preliminary engineering (PE) and the environmental review process for the project. A request to initiate PE will be submitted to FTA in early 2001.
North Front Range Corridor (Ft. Collins-Denver)
Denver, Colorado
The Colorado Department of Transportation (CDOT) with the cooperation of local stakeholder agencies, will examine transportation options for the entire North Front Range Corridor, which extends 90 miles from the northern suburbs of Denver to the Wyoming border and includes the urbanized areas of Denver, Boulder, Longmont, Greeley and Fort Collins. Commuter rail is one of the alternatives being considered in the study. The North Front Range area demonstrated the highest ridership potential in a statewide commuter rail feasibility study completed in 1996. The feasibility study estimated ridership at 721,500 per year for an 85-mile Denver-Greely-Ft. Collins line and 416,200 per year for a 74-mile Denver-Boulder-Longmont-Loveland-Ft. Collins line. Both of these segments, as well as shorter lines using the same alignments, are under consideration in the current study. Phase 1 of the study was completed in 1998 and recommended more detailed consideration of commuter rail, high occupancy vehicle lanes and highway improvements. Phase 2 of the study is currently underway. Through FY 2001, Congress has appropriated $0.5 million in Section 5309 New Starts funds for this effort. These funds lapsed in October 2000.
West Corridor
Denver, Colorado
The Denver Regional Council of Governments (DRCOG), in cooperation with the Colorado Department of Transportation (CDOT) and the Regional Transit District (RTD), has completed the technical work for a Major Investment Study (MIS) to evaluate improvements in the West Corridor, linking downtown Denver with the City of Golden at the intersection of US Routes 6 and 40, along West Colfax and Sixth Avenues. The West Corridor MIS was coordinated with concurrent MISs of the region’s East and Southeast Corridors. Included in the recommendations for the West Corridor is approximately 12.5 miles of light rail from Union Station to the Cold Spring Park-n-Ride, as well as some enhanced bus service. The capital cost of the recommended alternative is estimated at $251 million, with annual operating costs of $11 million. DRCOG has officially adopted this locally preferred alternative by including it in the Long-Range Transportation Plan. Construction has been initiated for a segment of the corridor. The segment will be called the Central Platte Valley Connector and run from the Colfax Avenue station on the existing Central Corridor LRT system to the Denver Union Terminal and serve the Auraria Campus, the Pepsi Center, Mile High Stadium and Lower Downtown Denver. Project sponsors will fund the $44 million segment with a combination of Federal, State, local and private funds. No New Starts funds will be used to fund the initial segment. The RTD Board has authorized the General Manager to begin the preliminary engineering (PE) and the environmental review process for the project. A request to initiate PE will be submitted to FTA in early 2001.
International Fixed Guideway (El Paso to Juarez)El Paso, Texas
The City of El Paso, Texas is proposing to reestablish a fixed guideway public transportation system between the City of El Paso, Texas and Cuidad, Mexico. The El Paso-Juarez region has the largest population of any international border in North America. The initial phase of the proposed international fixed guideway system involves approximately 1.6-miles of fixed guideway in downtown El Paso, Texas and an approximately 0.75-mile segment in downtown Juarez, Mexico. Until 1974, a rail trolley system linked the downtown areas of both cities. Tremendous growth and increased traffic resulting from the North American Free Trade Agreement (NAFTA) have increased traffic congestion on the region’s international bridges. Project sponsors are currently in the process of establishing an alignment, selecting the preferred technology, identifying stations and terminals, and developing an operational framework for the El Paso portion of the proposed system. The appropriate legal and international agreements will be pursued with local, State and Federal officials in Mexico to secure Mexico’s financial participation in the capital development and operation of the system. The total capital cost of the proposed project is estimated at $43.75 million.
South Bay Corridor
Fremont, California
The Santa Clara Valley Transportation Authority (SCVTA) is examining transportation options in a proposed corridor extending approximately 21 miles between the cities of Union and Fremont, including downtown San Jose. The corridor is located primarily in the southeast portion of the San Francisco Bay Area. The corridor is predominantly traveled by residents living in the East Bay area - and beyond - who work in Silicon Valley. The proposed corridor is the third most congested corridor in the Bay Area. Residential development in the East Bay area has been compounded by the significant job growth in the Silicon Valley area, which has resulted in very high and increasing levels of traffic congestion. In 1994, building on several earlier planning efforts, the Metropolitan Transportation Commission, in conjunction with local cities and transit agencies conducted a study to evaluate multiple transit options as a longer-term solution. This included an option of extending the Bay Area Rapid Transit and SCVTA’s rail systems. Capital costs for a potential extension ranged from $390 million - $1.14 billion, depending on the preferred technology and route alignments. A longer-term rail project is included in the 1998 Regional Transportation Plan for the San Francisco Bay Area. Further analysis, regional consensus and public involvement is needed to determine the specific technology and route alignments for a potential rail extension in the corridor.
Trolley Extension
Galveston, Texas
The City of Galveston is conducting a Modified Investment Study and preliminary engineering report to determine the most suitable alignment and technology for extending the existing Galveston rail trolley system. The Galveston trolley has been operating successfully since 1988 and has been previously extended to serve the new Harborside development north of downtown. Preliminary feasibility studies have identified the potential benefits of extending the existing system to serve Galveston Island’s largest employer - the University of Texas Medical Center (UTMC) - on the East Side of downtown. A proposed route has been selected between downtown and the UTMC. The proposed extension has been adopted as part of the Houston-Galveston area Council’s Transportation Improvement Program and the Long-Range Transportation Plan. The study is scheduled for completion in 2000. Through FY 2001, Congress has appropriated $4.46 million in Section 5309 New Starts funds for this effort.
Cumberland/Dauphin County Corridor 1 Commuter Rail
Harrisburg, Pennsylvania
The Cumberland-Dauphin-Harrisburg Transportation Authority (Capitol Area Transit – CAT) is conducting a Transportation Investment Study for a selected priority transportation corridor known as “Corridor One.” The proposed corridor extends approximately 55 miles in central Pennsylvania between Carlisle and Lancaster, via Harrisburg. The proposed corridor has been endorsed by the Harrisburg Area Metropolitan Planning Organization, as well as through local funding from the Pennsylvania Department of Transportation and numerous county, township and municipal contributions. The study recommended commuter rail as the locally preferred alternative. CAT is currently focusing on a Minimum Operable Segment between Harrisburg to Mechanicsburg. Through FY 2001, Congress has appropriated $1.97 million in Section 5309 New Starts funds for this effort.
City Light Rail Connection to the Central Business District
Hartford, Connecticut
The City of Hartford is proposing to study the feasibility of a connection from the Central Business District in Hartford to the “North Meadows” area, in cooperation with the Greater Hartford Transit District (GHTD). This is an area adjacent to the Connecticut River, along the Interstate 91 (I-91) North Corridor. The I-91 corridor has experienced a variety of development including, suburban commercial, light manufacturing, sports and a music theater. The corridor will be further defined by the study and may include some elements of downtown circulation to maximize the efficiency of the transit connection. The alternatives being considered may include light rail and bus rapid transit as well as the potential for “fringe parking.” The City, the Regional Planning Agency and the Transit District are still defining the final scope of the project. The parties are proposing to develop this project by undertaking a two-phased feasibility study: Phase I: -- Bus Circulation Study and Phase II -- Light Rail Study. GHTD is preparing to begin Phase I, which will provide a general assessment of the current transit conditions and evaluate the need for a downtown circulator with connections to proposed busways. Phase II, Light Rail Study, will be undertaken at a later date. This project is in the Hartford area Long Range Transportation Plan. Through FY 2001, Congress has appropriated $1.48 million in Section 5309 New Starts funds for this effort.
Griffin Line
Hartford, Connecticut
The Greater Hartford Transit District (GHTD) conducted a Major Investment Study (MIS) to examine transit options within a proposed 16-mile corridor extending from downtown Hartford and several city neighborhoods to suburban towns to the north and on to Bradley International Airport. The MIS resulted in a Light Rail Transit (LRT) option as the Locally Preferred Alternative (LPA) being adopted in July 1995 by the Capitol Regional Council of Governments (CRCOG) – the local Metropolitan Planning Organization (MPO). Since that date, the State, CRCOG, GHTD and local officials, after extensive discussions on funding sources and local financial constraint, have determined that the LRT is not a viable alternative. The CRCOG is currently exploring alternatives to meet the travel demands in this corridor. Following the identification of a Locally Preferred Alternative, a financial plan for the full development of the project will be determined. Through FY 2001, Congress has appropriated $0.99 million in Section 5309 New Starts funds for this effort.
Old Saybrook-Hartford Rail Extension
Hartford, Connecticut
The proposed project involves the reconstruction of the existing rail line between Old Saybrook and Hartford. Future passenger uses, however, remain uncertain. The line is currently inactive except for a short tourist operation near Old Saybrook. At this time, definitive planning efforts have not been undertaken for this effort and it has not been included in Hartford’s Long-Range Transportation Plan. Through FY 2001, Congress has appropriated $0.49 million in Section 5309 New Starts funds for this effort.
Washington County Corridor
Hastings-St. Paul, Minnesota
The Minnesota Department of Transportation is considering the feasibility of implementing commuter rail service along a proposed 30-mile corridor located in Washington County. The proposed corridor would connect downtown St. Paul with Hastings, Minnesota in Dakota County, located southeast of St. Paul. The area under consideration extends approximately 30 miles along Canadian Pacific railroad tracks. Ridership estimates vary between 933 daily passenger trips with two proposed stations over the entire 30-mile corridor to 1,179 daily trips with ten proposed stations along the entire corridor. Total capital costs for the entire corridor are estimated at $108.8 million.
Primary Corridor Transportation Project
Honolulu, Hawaii
The City and County of Honolulu Department of Transportation Services is proposing improvements to address existing and future mobility demand in the Oahu’s primary transportation corridor. The proposed corridor extends from Kapolei in the Ewa District to the University of Hawaii-Manoa (UH-Manoa) and Waikiki in the Primary Urban Center. A Major Investment Study/Draft Environmental Impact Statement was released in August 2000. Three alternatives are examined in the document, including: (1) A No-Build alternative which includes those projects expected to implemented in the next three years and expansion of bus service in developing areas to maintain existing service levels; (2) A Transportation System Management (TSM) alternative which features the reconfiguration of the present bus route network to a hub-and-spoke system, and some highway elements; and (3) A Bus Rapid Transit (BRT) alternative which builds on the TSM alternative and adds the Regional and In-Town BRT system. The Regional BRT system includes a continuous H-1 BRT Corridor from Kapolei to downtown with contraflow express lanes and special bus ramps to transit centers. The In-Town BRT system would function as a high capacity transit spine from Middle Street to downtown, with a University Branch from downtown to UH-Manoa, and a Kakaako-Waikiki Branch that extends from downtown to Waikiki via Kakaako. The locally preferred alternative is anticipated for selection in late 2000. Through FY 2001, Congress has appropriated $2.47 million in Section 5309 New Starts funds for this effort.
Advanced Transit Program (West Loop Corridor)
Houston, Texas
The Advanced Transit Program (ATP) is a $304.8 million program that is proposed for funding with fifty percent Section 5309 New Starts funds and fifty percent local funds. The ATP includes a number of projects, including two Major Investment Studies (MIS) - (Downtown to Astrodome and West Loop Corridors). The Downtown to Astrodome MIS/Environmental Assessment was completed in September 1999. Preliminary engineering for the resultant light rail locally preferred alternative is currently underway. The West Loop MIS is scheduled for completion in March 2001. The West Loop MIS is locally funded. Through FY 2001, Congress has appropriated $8.40 million in Section 5309 New Starts funds for the ATP. Section 5309 New Starts funds appropriated through FY 1999 were applied to the MIS/EA for the Downtown to Astrodome LRT. Assignment of FY 2000 and FY 2001 funds is pending.
Northeast Indianapolis Corridor
Indianapolis, Indiana
The Indianapolis Metropolitan Planning Organization, in cooperation with the Indiana Department of Transportation and other stakeholders, is conducting a Major Investment Study to examine the feasibility of major transit investments within the northeast portion of Marion County and the Southeast portion of Hamilton County between U.S. Route 31 and Interstate 70. The study corridor also encompasses parts of Interstate 69/State Route 37 and Interstate 465. In previous years, I-69/SR 37, as well as U.S. 31, were identified for major highway investments. Traffic congestion, along with rapid commercial and industrial development, has also been increasing within the study corridor. However, as a result of including improved transit service as a potential alternative, the Hoosier Heritage Port Authority purchased the Norfolk Southern rail line extending from 10th Street in Indianapolis to Tipton, Indiana. Through FY 2001, Congress has appropriated $5.19 million in Section 5309 New Starts funds for this effort.
Jacksonville Fixed Guideway Corridor
Jacksonville, Florida
The Jacksonville Transportation Authority and the Florida Department of Transportation are planning to conduct a corridor-level study for a single corridor in the Jacksonville urbanized area of Duval, Clay, and St. Johns' counties. The proposed study is a continuation of a systems planning effort known as the Jacksonville Long-Range Corridor and Park and Ride Study (JLRCS) - Phase II. The JLRCS will result in the selection of one corridor for study in the corridor-level analysis. The proposed study will consider all viable transportation alternatives for improving mobility in the selected corridor. The corridor-level effort will be based upon the Jacksonville Urban Area Transportation Study (JUATS) Update for 2020, nearing completion. The JUATS will also include a proactive, focused and citizen-led public involvement program. The corridor-level study is scheduled for completion in 2000.
Southtown Corridor
Kansas City, Missouri
In 1995, the Kansas City Area Transportation Authority (KCATA) completed a Major Investment Study (MIS) that examined transit improvements for a corridor extending from the Missouri River through downtown Kansas City and south to the Country Club Plaza, with extensions further south to 85th Street and east and south to 75th Street along Watkins Drive. The locally preferred alternative (LPA) resulting from the MIS recommended that a 15.2-mile light rail transit (LRT) line be constructed within the corridor. The LPA was subsequently included in the Mid-America Regional Council’s (MPO) long-range transportation plan. Capital costs were estimated at $450 million ($1994). KCATA proposed to build the project in phases with an initial 5.6-mile starter segment extending from the Missouri River to the Plaza at approximately 52nd Street. Total capital cost for the starter segment was estimated at $250 million. The starter segment was projected to average 10,800 daily boardings, including 4,200 new riders, in the year 2010. In October 1995, FTA approved the initiation of preliminary engineering (PE) for the Southtown Corridor project. The PE phase has progressed slowly as local officials are currently refining the LPA alignment and local financing plans. Through FY 2001, Congress has appropriated $7.48 million in Section 5309 New Starts funds for the project.
Kenosha-Racine-Milwaukee Rail Extension [Metra]
Kenosha-Racine-Milwaukee, Wisconsin
The Southeastern Wisconsin Regional Planning Commission (SEWRPC) – local Metropolitan Planning Organization - plans to conduct an Alternative Analysis study to examine the feasibility of extending Chicago-based Metra commuter rail service from Kenosha to Racine and Milwaukee. The study will focus on a proposed 33-mile corridor connecting the central business districts of Kenosha, Racine and Milwaukee in southeastern Wisconsin. SEWRPC has recently completed a feasibility study - funded entirely with local funds - that concluded that the extension is feasible. SEWRPC has adopted the project into the region’s Long-Range Plan. Through FY 2001, Congress has appropriated $5.44 million in Section 5309 New Starts funds for this effort.
Electric Transit
Knoxville, Tennessee
The City of Knoxville is proposing an innovative program to incorporate multi-modal linkages among and between downtown Knoxville destinations. The Downtown Knoxville Transportation Linkages Study is examining the feasibility of connecting numerous destinations in downtown Knoxville with a fixed guideway transit system as well as a Transportation System Management alternative. The proposed program addresses the linkages that will connect these downtown generators with trolleys and a dedicated trolley route around downtown Knoxville, as well as bus transit, bicycle and pedestrian ways, transfer stations and intermodal parking/transit facilities. Through FY 2001, Congress has appropriated $1.49 million in Section 5309 New Starts funds for this effort.
Queens West Light Rail Link
Long Island City, New York
The proposed project involves the construction of a Light Rail Transit (LRT) line along the Long Island City (LIC) waterfront. The proposed LRT would connect the new Queens West development, currently under construction along the waterfront, with subway stations that are a substantial distance inland. The Queens West development is a large, residential and commercial project sponsored, in part, by the Port Authority of New York and New Jersey and the Empire State Development Corporation. The developer is also interested in enhancing existing New York City Transit bus service, possibly with improved bus stop signage, shelters and maps. A local Environmental Impact Statement (EIS) was developed and included an analysis of an enhanced bus shuttle to the subway stations. The LRT was not proposed as part of the EIS. Presently, a project sponsor has not been identified. However, several years ago the New York City, Queens Borough President’s Office made a similar proposal for an LRT along the LIC waterfront.
Metrolink (San Bernardino Line)
Los Angeles, California
The Southern California Regional Rail Authority (SCRRA) is proposing a series of improvements to its commuter rail service within an existing railroad right-of-way. These improvements include the construction of sidings in the Interstate 10 Corridor, an upgrade of siding at Marengo and the double tracking of a line between the existing Pomona and Montclair stations. These improvements will result in an increase in frequencies, a reduction of commuter train delays, and an improvement to the schedules of counter-flow trains on the San Bernardino Line. The San Bernardino Line has the highest ridership of all Metrolink lines. There are currently 26 daily train trips in the corridor serving 8,200 daily commuter rail trips. The estimated capital cost for the proposed project is $31.4 million. Through FY 2001, Congress has appropriated $1.96 million in Section 5309 New Starts funds for this effort.
Metrolink (Union Station-Fullerton)
Los Angeles, California
The Southern California Regional Rail Authority, Caltrans, Amtrak, and the Burlington Northern Santa Fe Railroad have proposed a series of multiple track improvements between the City of Fullerton and Los Angeles’ Union Station. The proposed project is located on the existing Metrolink Orange County Line, which is part of the Los Angeles-San Diego Rail Corridor (LOSSAN) between San Diego and Los Angeles. The proposed corridor is the second busiest in the nation. Throughout the Fullerton to Los Angeles section of the corridor, there are 21 Amtrak intercity train trips, 22 commuter rail trips and 41 freight trips. Metrolink ridership on the Orange County Line has grown to over 5,600 daily trips. Local agencies have jointly contributed over $400 million to purchase and upgrade the proposed corridor. Amtrak contributed approximately $15 million of this amount. The portion of the LOSSAN corridor from Los Angeles to San Diego is owned entirely by public agencies, except the proposed 25-mile section between downtown Los Angeles and Fullerton. The Burlington Northern Santa Fe Railroad owns the Union Station-Fullerton segment.
Redlands-San Bernardino Transportation Corridor
Los Angeles, California
The Southern California Regional Rail Authority (Metrolink) is proposing a complete reconstruction of a mile of rail line previously purchased by the agency. The proposed rail line extends from the San Bernardino Metrolink station eastward to Redlands. The first phase extends approximately one mile to the site of a proposed intermodal bus terminal in downtown San Bernardino. The bus facility is currently in final design. If the proposed rail project is completed, it will allow many Metrolink trains to connect directly with the new bus facility. The proposed project will also provide for the design and construction of a signal system for the first mile. The proposed project is included in the State Transportation Improvement Plan. Through FY 2001, Congress has appropriated $1.99 million in Section 5309 New Starts funds for this effort.
Santa Monica Boulevard Transit Parkway
Los Angeles, California
The Los Angeles County Metropolitan Transportation Authority (LACMTA) is studying a section of Santa Monica Boulevard (State Route 2) between the San Diego Freeway (Interstate 405) and Moreno Drive, the boundary line between the cities of Los Angeles and Beverly Hills. The purpose of the study is to develop a multi-modal corridor, including improved operational efficiency of the roadway, priority treatments to improve bus transit flow, improved aesthetics, a bikeway and parkway, increased safety, and the preservation of the right-of-way for future rail improvements in the Santa Monica Boulevard corridor. The California Department of Transportation (Caltrans) approved a Project Study Report (PSR) in October 1994. The PSR outlined a one-way couplet project concept for each direction. In January 1996, the LACMTA initiated a Major Investment Study (MIS) to refine the alternative approved in the PSR. In June 1997, LACMTA initiated preliminary engineering and environmental clearance for the project. The draft environmental document was released for a minimum 45-day comment period in early 1999. A public hearing was held in April 1999. LACMTA’s Planning and Programming Committee and the full LACMTA board approved the project in July 1999. A Notice of Determination, required by the California Environmental Quality Act, was filed and posted in August 1999. Lead agency responsibility is being transferred to the City of Los Angeles who will be responsible for design and construction. Final design is slated to begin after the Los Angeles City Council concurs on the project and all required agreements are executed between the appropriate agencies. Construction is scheduled to begin in late FY 2001 and conclude in FY 2003.
South Central Corridor
Louisville, Kentucky
The Transit Authority of River City (TARC) has completed the “Transportation Tomorrow (T-square)” Major Investment Study (MIS) for a proposed corridor that would operate in an exclusive right-of-way extending south from downtown Louisville to an area just beyond the “Outer Loop,” a distance of approximately 15 miles. The Locally Preferred Alternative (LPA) is a light rail transit system with 21 stations and includes an enhanced bus element. Enhanced bus service will include augmented cross-county service, which will connect riders from local neighborhoods to the proposed rapid transit line. Improvements to both the existing bus service as well as the proposed bus enhancements will be considered. The preliminary capital cost estimate for the enhanced bus element is approximately $25 million. Proposed station sites for the LPA are being considered at: Downtown, Medical Center, Smoketown, Shelby Park, University of Louisville - Student Center and Papa John’s Stadium, Kentucky Fair and Exposition Center (Southern Heights), Louisville International Airport, United Parcel Service, Ford Motor, Inc. and a proposed park-and-ride lot/maintenance facility to be located between the “Outer Loop” and the Gene Synder Freeway. The preliminary capital cost for the LPA is estimated $640 million. The proposed project was adopted in the local metropolitan planning organization’s long-range transportation plan in April 1999. TARC has initiated the environmental review process for the project.
North Bay Commuter Rail
Marin/Sonoma, California
Sonoma and Marin Counties are exploring the possibility of implementing passenger rail service along an existing rail right-of-way. Some initial planning studies have been conducted. However, this effort has not proceeded into the alternatives analysis stage of planning. Presently, funding for completion and operation of a rail line has not been identified. A local sales tax measure with the potential to fund a rail project did not pass a November 1998 referendum.
Memphis Regional Rail Plan
Memphis, Tennessee
The Memphis Area Transit Authority (MATA) has completed a Long-Range Plan that includes Light Rail Transit (LRT) in three proposed corridors for the year 2020. The plan has been adopted by the local Metropolitan Planning Organization (MPO). The three proposed corridors include the East, North and South corridors. The East corridor extends a distance of approximately 24.8 miles, and encompasses Downtown, Midtown, East Memphis, Germantown, and Collierville. Total capital cost for the East Corridor is estimated at $443 million. Daily ridership for the East Corridor is anticipated to be 34,300 by the forecast year 2020. The North Corridor extends a distance of 17.6 miles and includes Downtown, North Memphis, Frayser, and Millington. Total capital cost for the North Corridor is estimated at $304 million. Daily ridership for the North Corridor is estimated to be 6,900 for the year 2020. The South Corridor extends a distance of approximately 19 miles, and includes Downtown, South Memphis, Whitehaven, Southhaven, and a spur to the Airport. Total capital cost for the South Corridor is estimated at $330 million. Daily ridership is anticipated to be 21,200 by the year 2020.
Kendall-Airport Corridor
Miami, Florida
The Miami-Dade Transit Agency (MDTA), in cooperation with the Florida Department of Transportation (FDOT), is conducting an Alternatives Analysis study to examine mobility improvements in the Kendall corridor to the Miami Intermodal Center (MIC). The corridor spans approximately 15 miles with both east-west and north-south segments. The Kendall segment, from Southwest 147th Avenue to the Dadeland area, is centered along Southwest 88th Street or North Kendall Drive. The Palmetto/Airport segment, from the Dadeland area to the Miami International Airport (MIA), is centered along the Palmetto Expressway (State Route 826) corridor. Major generators, along with the study area, include the MIA, Mall of Americas, Downtown Dadeland, Baptist Hospital and Miami-Dade Community College (Kendall Campus). The Kendall-Airport AA study commenced in April 1998 and is scheduled for completion during the winter of 2000. The study follows Miami-Dade’s 2015 Long-Range Transportation Plan, which identified the Kendall and Palmetto corridors as requiring premium transit treatment. Several prior studies have examined the feasibility of transitways in the study area and concluded that transitways were viable options. The Kendall-SR 826 AA study is being funded locally by the FDOT and managed by the MDTA.
Northeast Corridor
Miami, Florida
The Miami-Dade Transit Agency (MDTA) is planning to conduct an Alternatives Analysis (AA) study for the area’s Northeast Corridor. The proposed corridor extends approximately 13.6 miles from Miami’s central business district to the Broward County line, serving the cities of Miami, Miami Shores, North Miami, North Miami Beach and Aventura. The Northeast Corridor AA will examine mobility enhancements generally along the Biscayne Boulevard alignment that includes a parallel railroad corridor. Transit technologies that will be studied include both busway and light rail/diesel multiple unit rail options. The corridor was identified in the Miami-Dade’s 2020 Long-Range Transportation Plan as needing premium transit improvements. It also has been studied as part of the Metropolitan Planning Organization’s Miami-Dade Transit Corridors Transitional Analyses (1993), which concluded that the proposed corridor was viable for a transitway.
Palmetto Metrorail
Miami, Florida
The Miami-Dade Transit Agency (MDTA) has begun construction of a 1.4-mile extension of the Metrorail system from its northern terminus (Okeechobee Station) to west of the Palmetto Station (State Road 826). The project includes construction of one at-grade station and an at-grade 700-space park-and-ride facility. This project will facilitate auto access to the northern terminus station with its placement adjacent to the major roadway in the region. The project is estimated to generate 1,900 new transit riders by the year 2015. The estimated total capital cost for the project is $87.8 million. The 2000 Transportation Improvement Program anticipates that the Federal Government will provide 57 percent of the total capital costs, while state and county sources will provide 43 percent. The project is scheduled for completion in February 2002.
Downtown Transit Connector Study
Milwaukee, Wisconsin
In April 2000, the Wisconsin Center District, along with the Metropolitan Milwaukee Association of Commerce, the City of Milwaukee and Milwaukee County, initiated the Milwaukee Downtown Transit Connector Study to examine alternative transit improvements within the downtown Milwaukee area to link downtown attractions with hotels, residential, retail and business districts. The study area includes several Milwaukee neighborhoods such as East Town, West Town, Third Ward, Avenues West, Merri-Park, Story Hill and Brady Street. In 1997, a Major Investment Study/Draft Environmental Impact Statement (MIS/DEIS) for the Milwaukee East-West Corridor Transportation Study was completed with the selection of a Locally Preferred Alternative (LPA) recommending both transit and highway improvements for the area. The LPA was not implemented due to a lack of local consensus on funding options, and financial constraint issues. Accordingly, since much of the information that was prepared in the original MIS/DEIS is applicable to the current Downtown Transit Connector Study, study sponsors are planning to prepare a Supplemental Draft Environmental Impact Statement (SDEIS) in conjunction with the current effort. The SDEIS is anticipated for completion in Spring 2001. An LPA is anticipated in late 2001. This effort is being sponsored with non-Section 5309 New Starts funds.
Monmouth/Ocean/Middlesex Study
Monmouth-Ocean-Middlesex, New Jersey
The New Jersey TRANSIT Corporation (NJ TRANSIT) is conducting a Major Investment Study/Draft Environmental Impact Statement (MIS/DEIS) to consider transportation improvement options between Lakehurst and Newark, New Jersey. Several alignment possibilities have been examined and the options have been narrowed to diesel powered commuter rail on one of two alignments. An enhanced bus system was adopted by NJ TRANSIT’s Board of Directors and is now advancing as an independent initiative. In response to suggestions from two of the affected counties, analysis continues on two potential rail options, one of which would connect with Amtrak’s Northeast Corridor in Middlesex County and the other with the North Jersey Coast Line in Monmouth County. Information on the local financial commitment, mobility improvements, cost effectiveness, environmental benefits and operating efficiencies is being developed as part of the MIS/DEIS. Through FY 2001, Congress has appropriated $7.8 million in Section 5309 New Starts funds for this effort.
Monterey County Commuter Rail and Inter-City Passenger Rail
Monterey County, California
The Transportation Agency for Monterey County (TAMC) is proposing the development and extension of two commuter rail lines to Monterey County. The first component involves the extension of the Caltrain peninsula rail corridor, of which four trains now operate to Gilroy for peak commute trips in the morning and evening. TAMC is in the process of evaluating the ridership to determine which of the four trains to Gilroy should be extended to Monterey County and where the destination(s) should be. TAMC will develop a business plan for this extension, including identifying all the needed capital improvements, institutional arrangements and an estimation of the projected operating subsidy. The Caltrain extension would operate on an existing rail line from Gilroy to either Salinas or Seaside on the Monterey Peninsula. A second component includes the implementation of inter-city passenger rail service between San Francisco and Seaside. Monterey County has been allocated $17 million under the California Rail Initiative under State Proposition 116 and has secured $0.45 million for environmental clearance, preliminary design and an economic assessment of the branch line improvements between Castroville and Seaside. An additional $2.1 million was awarded to Monterey County for grade crossing improvements under TEA-21. The proposed inter-city passenger rail connection is being planned to connect with other existing rail services in the Bay area, including a connection with the Capital Corridor inter-city service between San Jose and Sacramento (Colfax) and the Altamont Commuter Express between San Jose and Stockton.
Personal Rapid Transit
Morgantown, West Virginia
The University of West Virginia is planning an upgrade of the heating and on-board vehicle control system on the Morgantown Personal Rapid Transit (M-PRT) system. The system was originally developed as a research and demonstration project during the 1970s. The system consists of 8.2 miles of dedicated guideway with five passenger stations and a fleet of 71 fully automated vehicles. Through FY 2001, Congress has appropriated $8.2 million in Section 5309 New Starts funds for this effort.
Nassau Hub
Nassau County, New York
An Alternatives Analysis (AA) Study is proposed by Nassau County, New York to examine transportation improvements within this 1.5 by 2-square-mile area, located in central Nassau County within the Town of Hempstead. The Nassau Hub is defined as an area bordered by Hempstead Turnpike (NY-24) to the south, Clinton Road to the west, Old Country Road to the north and Merrick Avenue to the east. However, the focal point of the Hub is the 1,100-acre former Mitchell Field Air Force Base that has become an extensive mixed-use development area that includes a range of commercial, recreational and institutional uses. The Nassau Hub, in its entirety, contains retail, office, manufacturing, warehousing, a regional active park, a preserve, two colleges, museums and a sports arena. The study will consider a range of alternatives, including light rail transit, a fixed guideway loop, and shuttle buses that would connect existing facilities and new infill development into a pedestrian/transit-friendly environment. Potential circulator transit service would also connect with a Long Island Rail Road (LIRR) commuter rail station(s). Nassau County will seek assistance from the New York Metropolitan Transportation Council (local Metropolitan Planning Organization), LIRR and Long Island Bus, along with civic groups and the local business and development community. Through FY 2001, Congress has appropriated $0.5 million in Section 5309 New Starts funds for this effort. A grant for the AA study was awarded in December 1999.
Newburgh LRT System
Newburgh, New York
The City of Newburgh is planning to initiate a feasibility study for a proposed Light Rail Transit (LRT) system linking its Hudson River waterfront to Stewart International Airport. There is currently no public transportation between the two sites. The proposed LRT corridor would run along Broadway (Route 17K) connecting Newburgh’s waterfront, historic district and downtown commercial area with the airport and the surrounding industrial facilities, a distance of approximately four miles. The corridor could also be extended across the Hudson River -- via the Newburgh Beacon Bridge -- to an existing Metro-North commuter rail station, creating an innovative intermodal system. A segment of the proposed corridor passes through the City’s federally designated Enterprise Community area. It would also serve a major portion of Newburgh’s New York State Economic Development Zone (EDZ). The proposed LRT would boost tourism in the City by creating a unique and direct link between its historic waterfront area and the region’s major entry point for outside visitors. In addition, the proposed project would provide job access to the Stewart vicinity’s industrial sites for Newburgh’s underutilized work force. The feasibility study would take approximately 12 months to complete and include consultation with the Town of Newburgh, State of New York Department of Transportation, Stewart Airport Commission, New York Metropolitan Transportation Authority/Metro North, New York State Thruway Authority, New York State Bridge Authority and the Newburgh EDZ. The study would also include consideration of alternative transportation systems.
Waterfront Access
New London, Connecticut
The proposed Waterfront Access project in the City of New London is an extension of the existing waterfront and its Intermodal facility. The City is in the process of defining the project. Through FY 2001, Congress has appropriated $0.49 million in Section 5309 New Starts funds for this effort.
East Jefferson Corridor
New Orleans, Louisiana
In April 1999, the Regional Planning Commission (local metropolitan planning organization) for the Jefferson, St. Bernard, Orleans, St. Tammany and Plaquemines Parishes, completed a Major Investment Study (MIS) for a corridor extending approximately 15 miles from Interstate 310 and the New Orleans International Airport to Downtown New Orleans and the Union Passenger Terminal on the East Bank of the Mississippi River. Alternatives studied included No-build, TSM, U.S. 61 Widening, Earhart Boulevard Extension, rail development (technology unspecified), busway, truckway and a combination alternative. The MPO selected a combination alternative as it locally preferred alternative consisting of both rail and an extension of Earhart Boulevard. Total estimated capital costs – in order of magnitude – range from $140 million (rail alternative) to $500 million (Earhart Boulevard extension). During the course of the MIS, particular attention was given to the sensitivity to community impacts and involved a large public involvement component. It is anticipated that this emphasis will continue into the environmental review phase that will be led by the Louisiana Department of Transportation and Development. Land use impacts will be addressed in more detail as well as the alignments, design and technology. To date, none of the alternatives have been included in the Transportation Improvement Program beyond the environmental review phase. However, a placeholder has been included in the region’s recently adopted Long-Range Transportation Plan.
Trans-Hudson Midtown Corridor
New York/New Jersey Metropolitan Area
The Port Authority of New York and New Jersey, along with the New York Metropolitan Transportation Authority and the New Jersey TRANSIT Corporation (NJ TRANSIT) are conducting a Major Investment Study (MIS) to examine the feasibility of establishing new transportation links from Westchester and Western Queens, New York, through Midtown Manhattan, and on to Northern New Jersey. This effort is known locally as the Access to the Region’s Core (ARC) study. A Milestone Summary Report identified as the preferred alternative a commuter rail solution involving all three of the region’s commuter railroads – NJ TRANSIT, the Long Island Rail Road and Metro-North - allowing all three railroads to gain access to New York’s Penn Station and Grand Central Terminal. The alternative involves a new commuter rail tunnel under the Hudson River to an expanded Penn Station with a tunnel extension to Grand Central Terminal. Project sponsors are seeking approval to complete Phase III of the MIS with detailed analysis of this alternative as well as possible variants, including an investigation of potential freight opportunities. The analysis is also evaluating capacity expansion strategies at New York’s Penn Station in the near term. The MIS is scheduled for completion in the Spring of 2001. Through FY 2001, Congress has appropriated $4.90 million in Section 5309 New Starts funds for this effort.
8th Avenue Subway Connection
New York, New York
The Pennsylvania Station Building Redevelopment Corporation (PSRC) is proposing a pedestrian connection between the existing Pennsylvania Station and the new Amtrak area in the James A. Farley Building as a component of the Pennsylvania Station Building Redevelopment Project. The proposed project would widen an existing pedestrian passageway on 33rd Street (Midtown Manhattan) which connects Penn Station with the New York City Transit 8th Avenue/34th Street Subway Station and the Long Island Rail Road West End Corridor and extend it to the Farley Building. The existing passageway is currently overcrowded. In addition to widening the corridor, the proposed project includes reducing the grade of a ramp in the corridor, improving accessibility for the disabled, and upgrading the lighting, ventilation and life safety components. Total capital costs for the proposed connection are estimated at $10.8 million. The construction budget for the Farley Building Project is estimated at $305 million. The overall Farley Building Project is estimated at $788 million, of which $268 million is proposed for Federal funding. In addition, $160 million in TIFIA loan funds have been applied to the project. The 8th Avenue Subway Connection represents a portion of the Federal share. The Federal Railroad Administration (FRA) has been the lead agency for the project. FRA issued a Finding of No Significant Impact for the project in September 1999.
Astoria-East Elmhurst Extension (LaGuardia Airport Subway Access Study)
New York, New York
The LaGuardia Airport Subway Access (LASA) Study, previously known as the “Astoria East Elmhurst Extension,” is being conducted as part of a cooperative partnership comprised of the City of New York, Queens Borough President’s Office, the Port Authority of New York and New Jersey and the New York Metropolitan Transportation Authority (MTA). The purpose of the LASA Study is to determine the physical, operational and capital requirements, environmental impacts and potential mitigation measures associated with the provision of one-seat ride subway service from Lower and Midtown Manhattan to LaGuardia Airport. An Alternatives Analysis/Draft Environmental Impact Statement (AA/DEIS) is being conducted by the MTA, acting as the lead local agency. The FTA is the lead federal agency in the planning effort, with the Federal Aviation Administration, Federal Highway Administration and the Federal Railroad Administration, acting as cooperating agencies, as defined by the National Environmental Policy Act. Using an established set of criteria, a “long list” of approximately 20 alternatives is being screened down to a “short list” that will be evaluated in more detail. These alternatives include various branches and/or extensions of the New York City subway system and the Long Island Rail Road, and also include new people mover and guided busway systems. The DEIS will include the build alternatives that survive the short list evaluation and will then be analyzed for environmental impacts. The AA/DEIS is currently scheduled for completion in early 2002 with the Final EIS to be completed in late 2002. The present LASA Study has been funded with local sources. Beyond the planning and environmental review phase, the MTA has included $645 million in its FY2000-FY2004 Capital Program to complete preliminary engineering, final design and construction of key off-airport segments, should a build alternative be selected as the preferred alternative. The Capital Program also includes a contribution towards the cost of construction of the on-airport segment.
Broadway-Lafeyette-Bleecker Street
New York, New York
See the description for the Brooklyn-Manhattan Access project. Project sponsors have informed FTA that the two are the same.
Brooklyn-Manhattan Access (formerly known as the East River Crossing MIS)
New York, New York
The New York Metropolitan Transportation Authority (MTA) and New York City Transit (NYCT) have completed an Option 1 Major Investment Study (MIS) to examine the preliminary operating and engineering options for improving the capacity and flexibility of subway services crossing the East River. The study was formerly known as the East River Crossing MIS. The distribution among the subway lines crossing the East River is uneven and some crossings are congested while others have underutilized capacity. One of the major goals of the study was to provide alternatives to current NYCT subway service over the aging Williamsburg and Manhattan bridges. The MIS reviewed approximately 68 strategies and ultimately recommended Manhattan Bridge Alternative 5 (MBA 5) as the preferred alternative to be advanced for further analysis. The full MBA 5 Alternative has an estimated capital cost of approximately $600 million, and an estimated operating cost of $0.4 million. The MBA 5 Alternative is comprised of five components. These include: Rutgers Street Tunnel-DeKalb Avenue Track Connection; Lawrence Street-Metro Tech to Jay Street Passenger Transfer; Broadway-Lafayette and Bleecker Street Passenger Transfer; Revise Existing Service Pattern on the D/Q/N lines; and lengthen the No. 3 line trains. The MBA 5 Alternative also recommended adding approximately 12 additional passenger trains per hour. These components are important to NYCT system improvements. However, the Rutgers Street-DeKalb Avenue Track Connection provides the major benefits of the MBA 5 Alternative and its ability to provide critically needed system flexibility and additional capacity. In addition, it should be noted that while the study has been completed and a recommended alternative identified, the MTA/NYCT is focusing on the engineering of the Broadway-Bleecker Street and Jay Street passenger transfers as distinct components. These activities have been programmed into the MTA’s FY 2000-FY2004 Capital Program. The Broadway-Bleecker Street passenger transfer is programmed for construction at $25 million in 2004. Design is expected to start in 2001, and construction in 2004. The Lawrence-Jay Street transfer is programmed for design at $0.6 million in 2001.
Brooklyn-Staten Island Ferry
New York, New York
The New York City Department of Transportation (NYCDOT) and the Port Authority of New York and New Jersey (PORT) recently performed a series of studies examining potential routes connecting Staten Island (SI) with Downtown Brooklyn, either directly, after a stop in Manhattan, or enroute to a Midtown-Manhattan landing. Currently, there is no ferry service from Staten Island to Downtown Brooklyn. However, there is ferry service serving the Brooklyn Army Terminal Pier at 60th Street enroute from Monmouth County, New Jersey to Manhattan. In 1997, NYCDOT solicited the business community’s interest in operating these routes. The response to the request resulted in limited interest by private operators, in part due to the recent elimination of SI Ferry passenger fares, and the creation of the One City-One Fare free transfer between the New York Metropolitan Transportation Authority’s buses and subways. NYCDOT has indicated that if a private ferry operator were to express interest, NYCDOT would consider constructing or enhancing existing docking space to support the service.
Lower Manhattan Access Alternatives Study
New York, New York
See the description for the Second Avenue Subway project.
Manhattan East Side Alternatives
New York, New York
See the description for the Second Avenue Subway project.
Midtown West Ferry Terminal
New York, New York
The New York City Department of Transportation (NYCDOT), in cooperation with the New York City Economic Development Corporation, is proposing the development of a ferry terminal on Manhattan’s West Side for the ferry services along the Hudson River and New York Harbor. The largest operator would be New York Waterway (a private ferry operator owned by Authur Imperatore). The proposed terminal is located geographically on the West Side of Manhattan. An expanded terminal is expected to serve additional ferry routes along the Hudson River and from New York Harbor. A separate project has been proposed for the New York Waterway Terminal on the New Jersey side of the Hudson River that does not involve NYC DOT. Total capital costs for the Midtown West Ferry Terminal are estimated at $22.24 million. The Federal Highway Administration is supporting the design and engineering costs of the project. NYC DOT is anticipated to apply for construction funding in the year 2000. Through FY 2001, Congress has appropriated $2.48 million in Section 5309 New Starts funds for the project.
North Shore Railroad
New York, New York
The Rehabilitation of the North Shore Railroad Line project involves conducting an Alternatives Analysis/Draft Environmental Impact Statement (AA/DEIS) to examine the feasibility of re-establishing passenger rail service along the North Shore Rail line located on Staten Island, New York. Originally, the line went from Cranford, New Jersey to the St. George Ferry terminal on Staten Island. The current project only considers the section between the Arlington Rail Yards and St. George, Staten Island, a distance of approximately 5.2 miles. This effort is part of a larger project to improve intermodal connections between New York and New Jersey to transport freight from ocean-going ships and trucks as well as passengers to a new industrial work site, the Howland Hook Marine Terminal on Staten Island. This project is also expected to stimulate economic development on Staten Island (SI). The study will evaluate a range of alternatives, including No-build, bus rapid transit, commuter rail and diesel multiple unit technology. Phases 1 and 2 of the rehabilitation project have been completed. Phase 3 consists of revitalizing the remaining portion of the rail corridor for passenger service and implementing the AA/DEIS study. Currently, the project is not in the Transportation Improvement Program/State Transportation Improvement Program. However, the North Shore Railroad Line project is one study, among others, of the Corridor Level Options discussion in the draft Regional Transportation Plan for the New York City urbanized area. Other related studies include: Cross Harbor Freight Movement Major Investment Study – this effort is evaluating a rail freight tunnel that may use a portion of the SI North Shore Line. Another effort is a New York City Department of City Planning Rails with Trails study that proposes a greenway trail sharing one trackway of the SI North Shore Line, provided it remains a lightly used freight line. FTA provided $10.4 million to purchase the Staten Island North Shore Railroad right-of-way from Howland Hook to St. George.
St. George Ferry Intermodal Terminal
New York, New York
The New York City Department of Transportation (NYCDOT) is proposing to modernize the Saint George Ferry Terminal. The terminal is located on Staten Island and functions as a termination point for ferry service between Staten Island and Manhattan. The terminal also provides intermodal connections for commuter rail (New York Metropolitan Staten Island Railway - SIR), New York City Transit bus, vans, automobiles, bicycles and pedestrians. The facility has not undergone significant reconstruction since it was built in 1950 after a fire destroyed the original terminal. Hence, there are areas in and around the terminal that need immediate improvements. In addition, portions of the terminal have been closed to public access due to unsafe conditions. The proposed modernization and reconstruction of facilities will include new entrances, a pedestrian plaza at the concourse level, new stairs, escalators and elevators, parking facilities that conform with the Americans with Disabilities Act (ADA) of 1990, a new pedestrian walk, intermodal improvements to the bus complex and retail stores. A new minor league baseball stadium is also being built immediately adjacent to the terminal on the west side. In addition, the National Lighthouse Museum is expected to move into historic former U.S. Coast Guard buildings located on the east side. Total capital costs are currently estimated at $101 million. Funding for the proposed project will come from a combination of sources including, the FTA, NYCDOT, and the State. A Finding of No Significant Impact was approved for the project in September 2000. It is important to note that although NYCDOT would be the grantee for the funds, the lead agency for design and construction would be in the New York Economic Development Corporation. Through FY 2001, Congress has appropriated $2.5 million in Section 5309 New Starts funds for the project.
Second Avenue Subway
New York, New York
The New York Metropolitan Transportation Authority (MTA) is planning to develop a full-length Second Avenue subway line along the East Side of Manhattan from 125th Street to the Financial District in Lower Manhattan pursuant to approvals by the MTA Board and the MTA Capital Program Review Board. The East Side of Manhattan has only one rapid transit line (Lexington Avenue). The line experiences significant overcrowding during peak periods. In 1995, the line carried approximately 288,000 inbound daily passenger trips. There is limited additional capacity to expand bus service. The specific alignment of the full-length subway line is being developed by two coordinated studies: Manhattan East Side Alternatives (MESA) Study and the Lower Manhattan Access (LMA) Study. FTA is sponsoring both studies. The MESA Study has completed a Major Investment Study/Draft Environmental Impact Statement (MIS/DEIS) on the northern segment of the Second Avenue subway from 125th Street to the 63rd Street subway line. The LMA Study is completing an MIS/DEIS on the southern segment of the Second Avenue subway from 63rd Street to Lower Manhattan. FTA and the MTA are developing an approach to complete the planning and environmental review process for the full-length Second Avenue subway using these two studies. The MTA has included $1.05 billion in its FY2000-FY2004 Capital Program for planning, environmental review, design and engineering, and the initiation of construction by the end of 2004.
Whitehall Intermodal Terminal
New York, New York
The New York City Department of Transportation (NYCDOT) is undertaking the reconstruction of the Whitehall Street Intermodal Ferry Terminal. The terminal, located at the southern tip of Manhattan was mostly destroyed by fire in 1991 and ferry service has been operating out of interim facilities since then. Reconstruction of the terminal will include improved connections with the New York City Transit subway and bus system. The Staten Island Ferry System moves over 65,000 riders daily. A F |