FTA Library - Reports & Miscellaneous

The following topics are presented in this Library page:

Enter a keyword in the text box below to search text on this page:

Enter a keyword in the text box below to search all content within the Library:



Note: Click any column header to sort by that title.

Name Topic Publication Date Description
2006 Before and After Studies Letter to Congress (PDF)
,Fact Sheet,Information Sheet,Policy Letter
08-23-06

Letter to congress detailing the SAFETEA-LU addition to the US code requirments.

2007 Before and After Studies of New Starts Projects (MS Word)
,Reports to Congress
09-05-07

Study detailing the before and after of new starts projects.

2007 Before and After Studies of New Starts Projects (PDF)
,Reports to Congress
09-06-07

Sudy detailing the before and after of new starts projects.

2008 Bus Rapid Transit Vehicle Demand & Systems Analysis Update (PDF)
,Report
08-01-08

Bus rapid transit vehicle & systems demand analysis BRT communities overall.

2009 Success in Enhancing Ridership Awards (PDF)
,Award or Honor
04-16-09

 

2009 Awards Ceremony was on May 4, 2009 at the APTA Bus and Paratransit Conference in Seattle, Washington. 
2011 Tribal Tansit Project Descriptions Table (PDF)
,Funding Recommendations
12-01-11

Tribal Transit Program discretionary projects recommended for funding.

A Transit Methodology Using Six Sigma For Heavy Rail Vehicle Maintenance Programs (PDF)
Report
08-31-09

Maintenance Program information.

Added Access Report (PDF)
,Final Guidance,Report
08-06-03

Added access report for FHWA as it relates to the environmental review process

Administrator Rogoff's Hearing on Rail Modernization (PDF)
,Rail Transit Vehicles and Systems,Transcript
08-03-09

Administrator provides testimony to Congress.

Administrator's Policy Letters: State of Good Repair (PDF)
,Policy Letter
09-30-08

Administrator Simpson's "Dear Colleague letter" about ways to keep our nations transit systems under a state of good repair.

Advanced Vehicle Emission Reduction Sensor Program (FED-SAVER) Report (PDF)
,Report
12-23-08

Details abut the development of a special sensor to increase fuel economy and lower emissions.

Alameda-Contra Costa Transit District (Oakland, CA) (MS Word)
,Report
02-14-05

Title VI compliance review Alameda-Contra Costa Transit Distrct in Oakland, CA.

Alternative Fuels Study: A Report to Congress on Policy Options for Increasing the Use of Alternative Fuels in Transit Vehicles (PDF)
,Reports to Congress
12-14-06

A Report to Congress on Policy Options for Increasing the Use of Alternative Fuels in Transit Vehicles

Alternative Fuels Study: A Report to Congress on Policy Options for Increasing the Use of Alternative Fuels in Transit Vehicles (PDF)
,Reports to Congress
12-14-06

Study, under SAFTEA-LU, about how to increase the use of alternative fuels in public transportation vehicles.

An Evaluation of the Market for Small-to-Medium-Sized Cutaway Buses: Bus Technologies and Testing Information (PDF)
,Report
01-18-08

Study deatiling the cutaway vehicle and how it benefits certain transit markets.

An Evaluation of the Market for Small-to-Medium-Sized Cutaway Buses: Reports (PDF)
,Report
05-19-08

Study detailing cutaway vehicles and thier benfits and costs to certain transit industries.

Analysis of Electric Drive Technologies for Transit Applications: Battery-Electric, Hybrid-Electric and Fuel Cells (PDF)
,Report
09-13-05

Examines electric drive technologies in bus transit systems.

Annual Performance Plan FY 2008 -- Final (PDF)
,Report
09-12-07

Details of the performance goals for the fiscal year.

Appendix 1: The Interstate 270 Metro Red Line Corridor Serving Washington, D.C. (PDF)
,Research Publication
03-27-00

Detailed breakdown of the Washington D.C. red line addition.

Appendix 2. The Midway Orange Line Corridor Serving Chicago (PDF)
,Research Publication
03-27-00

Detailed breakdown of theorange line corridor project.

Appendix 3. The North Hanley Light Rail Corridor Serving St. Louis (PDF)
,Research Publication
03-27-00

Detailed breakdown of the North Hanley light rail corridor project.

Appendix 4. The Butterfield Light Rail Corridor Serving Sacramento (PDF)
,Research Publication
03-27-00

Detailed breakdownof the Butterfield light rail corridor project.

Appendix 5. The Park Lane Light Rail Corridor Serving Dallas (PDF)
,Research Publication
03-27-00

Detailed breakdown of the Park Lane light rail corridor project.

APPENDIX A Fiscal Year 2011 Annual List of Certifications and Assurances for Federal Transit Administration Grants and Cooperative Agreements (PDF)
,Agreements
10-29-10

Description of how 49 U.S.C. 5323(n) applies to FTA assistance programs

Appendix A: Fiscal Year 2007 Annual List of Certifications and Assurances for Federal Transit Administration Grants and Cooperative Agreements (MS Word)
,Agreements,Forms
12-18-06

Description of how 49 U.S.C. 5323(n) applies to FTA assistance programs.

Appendix B (PDF)
,Report
06-30-05

Grain size analysis for Pacific International Engineering.

Appendix B: Financial Capacity Documents (PDF)
,Agreements
10-01-10

FTA mater agreement attachment.

Appendix D (PDF)
,Report
07-01-05

Wake analysis for the attorney general's office.

Appendix E (PDF)
,Report
07-01-05

Passenger only fast ferry project phas 1 details.

Applicability of Bogata's TransMilenio BRT System to the United States (PDF)
,Report
05-18-06

Applicability of Bogotá’s TransMilenio BRT System to the United States Final Report - May 2006  

Apportionment of Fiscal Year (FY) 2007 Metropolitan Planning Funds (Excel)
,Appropriations Report,Fact Sheet
12-06-00

Fiscal year 2007 financial obligations for metropolian and statewide research.

April 2008 Transit Research Update (MS Word)
,News Update
04-01-08

Complete update for 2008 on all current FTA research programs.

April 2009 Transit Research Update (MS Word)
,Information Sheet,Report,Research Publication
05-07-09

Complete update for 2009 on all current FTA research programs.

April 2010 Transit Research and Industry News Update (PDF)
,Information Sheet,Research Publication
05-04-10

Complete update for 2010 on all current FTA research programs.

ARC Handouts (MS Word)
,Meeting,Presentation
05-09-05

Tanrs-Hudson express tunnel project outline and background information.

ARC Handouts (PowerPoint)
,Meeting,Presentation
02-23-04

Trans-Hudson express tunnel project outline and background information.

Assessing the Business Case for Integrated Collision Avoidance Systems on Transit Buses (PDF)
,Report
10-17-07

In depth look at tranist bus safety and how it can be improved.

August 2008 Transit Research Update (MS Word)
,News Update
09-08-08

Outlines various publications and information released during 2008 for the FTA.

August 2009 Transit Research and Industry News Update (PDF)
,News Update
09-14-09

Outlines various publications and information released during 2009 for the FTA

Basic Grant Making Procedures Presentation (PDF)
,Presentation
12-09-07

A guide on how to recieve grant funding from FTA in Florida.

Beginning the Dialogue - Report on SGR (PDF)
,Report
10-08-08

Findings from the FTA about the state of good repair of our nations public transit systems.

Bellingham Report (PDF)
,Report
02-01-06

Detailed breakdown of the public transit state in Bellingham, WA

Better Coordination of Transportation and Housing Programs to Promote Affordable Housing Near Transit (PDF)
,Reports to Congress
09-17-08

Transit oriented development and how it can impact the quality of life.

Biodiesel Fuel Management Best Practices for Transit (PDF)
,Report
12-04-07

Description of the best implementation for biofuels in public transit.

Boston Silver Line Waterfront 2007 Evaluation (PDF)
,Report
07-18-07

Case study detailing the effects of Boston's silver line waterfront BRT system.

Broward County Transit (Broward County, FL) (MS Word)
,Report
06-20-05

Description of the grant terms for the Boward County Transit system.

Brownsville Urban System (Brownsville, TX) (MS Word)
,Report
08-11-05

Description of the grant terms for the Brownsville Urban System.

BRT Network Planning Study - Final Report (PDF)
,Report
02-07-08

Advanced Network Planning for Bus Rapid Transit The “Quickway” Model as a Modal Alternative to “Light Rail Lite”
Building Livable Communities with Transit (PDF)
,Report,Research Publication
11-05-99

Study detailing the impacts of public transit on development and economics.

Bus Rapid Transit Developments in China, April 2006 (PDF)
,Report
08-23-06

in depth analysis of China's BRT and rail systems and thier effects on the populous.

Bus Rapid Transit Vehicle Characteristics (PDF)
,Report
12-05-01

Provides a better understanding of the unique vehicle-related issues associated with BRT systems.

Bus Rapid Transit: Report on South American BRT Field Visits - Tracking the Evolution of the TransMilenio Model (PDF)
,Report
12-10-07

This report summarizes the background, status, and lessons learned from Bus Rapid Transit (BRT) plans and operations.

Central Arkansas Transit Authority (Little Rock, AR) (MS Word)
,Report
01-04-05

Title VI compliance review of the CATA-

Central Oklahoma Transportation and Parking Authority (Oklahoma City, OK) (MS Word)
,Report
11-10-04

Title VI compliance review of COTPA.

Central Puget Sound Regional Transit Authority (Seattle, WA) (MS Word)
,Report
02-14-05

Title VI compliance review of Sound Transit.

Characteristics of Bus Rapid Transit for Decision-Making (2009) (PDF)
,Report,Research Publication
02-09-09

CBRT report was prepared to provide transportation decision makers with information and data to support the development of bus rapid transit concepts

Charlotte Risk Assessment Presentation (MS Word)
,Presentation
05-09-05

South Corridor Light Rail Project: Project Risk Assessment

Charlotte Risk Assessment Presentation (PowerPoint)
,Meeting,Presentation
03-24-11

Complete breakdown of risks associated with the South Corridor light rail project.

Chicago Transit Authority (Chicago, IL) (MS Word)
,Report
12-20-04

Title VI compliance review of the CTA.

Childcare Services at Transit Stations (PDF)
,Presentation,Report
11-12-05

2005 report on successful examples of colocating childcare facilities at public transit centers including background and plans for further development.

City of Phoenix Public Transportation Department (Phoenix, AZ) (MS Word)
,Report
07-01-05

Title VI compliance review of the city of Pheonix.

Cleveland Report (PDF)
,Report
02-01-06

In depth look at public transportation in Cleavland, OH.

Coastal Georgia RDC Presentation (PDF)
,Presentation
11-01-07

Study for Coastal Georgia Region to develop a plan for coordinated, regional transportation system.

Collision Safety Improvements for Light Rail Vehicles Operating in Shared Right of Way Street Environments (PDF)
,Report
09-30-09

Improving safety standards for vehicles

Columbia/Equador (PowerPoint)
,Meeting,Presentation
03-20-07

Power Point Presentation on transportation in Colombia and Equador

Community Transportation Association - Joblinks Employment (PowerPoint)
,Meeting,Presentation
04-30-01

Joblinks presentation explaining the purpose and goals withing FTA.

Conference Report (MS Word)
,Fact Sheet,Information Sheet,Report
09-09-05

Details about the SAFTEA-LU new freedom program.

Construction Project Management Handbook: Reports (PDF)
,Report
12-21-06

A comprehensive introduction to construction project management for transit agencies new to the process.

Creating Section 508 Compliant Documents & Presentations (PowerPoint)
,Meeting,Presentation
11-17-05

Guidlines for creating section 508 compliant documentation.

Day 1 - Charter Final Rule Presentation (PDF)
,Meeting,Presentation
04-08-08

Description of the new charter rule and how to find more information.

Day 1 - AM - Beyond the Recession - Kentucky (PDF)
,Meeting,Presentation
04-16-09

The effects of the recession in Kentucky as well as the measure the state is taking to counteract the effects.

Day 1 - AM - Beyond the Recession - Mississippi (PDF)
,Meeting,Presentation
04-16-09

The effects of the recession in Mississippi and the measures the state is taking to counteract them.

Day 1 - AM - Beyond the Recession - South Carolina (PDF)
,Meeting,Presentation
04-16-09

The effects of the recession in South Carlina and the measures the state is taking to counteract them.

Day 1 - AM - State DOT Atlanta Meeting_April 2009 - Welcome and Beyond the Recession (PDF)
,Meeting,Presentation
04-16-09

Schedule of events and guidelines for state recession presentations.

Day 1 - Ia - NEPA Basics - Immings (PDF)
,Meeting,Presentation
05-19-08

NEPA basic concepts and implementation.

Day 1 - Ib - FTA 101 - Pfister (PDF)
,Meeting,Presentation
05-21-08

FTA 101 training presentation.

Day 1 - Ic - Third Party Procurement - Buy America - Jensen (PDF)
,Meeting,Presentation
05-28-08

Presentation on whats new for the buy amercian FTA program.

Day 1 - Ic - Third Party Procurement - JHarper (PDF)
,Meeting,Presentation
05-28-08

Third party procurment region IV workshop presentation.

Day 1 - Id - Safety and Security - Lazaro (PDF)
,Meeting,Presentation
05-28-08

FTA transit bus safety and sercuity program overview presentation.

Day 1 - IIa - NEPA Cat Ex - Immings (PDF)
,Presentation
05-19-08

Categorical exclusion and how to differentiate and document CatX.

Day 1 - IIb - Grant Making 101 - LaShore (PDF)
,Meeting,Presentation
05-19-08

Grant Making 101 presentation.

Day 1 - IIc - Charlotte TOD - Votaw (PDF)
,Meeting,Presentation
05-19-08

Scaleybark TOD/ joint development project presentation.

Day 1 - IId - Innovative Finance - Martin (PDF)
,Meeting,Presentation
05-19-08

Various region IV financing options and their pros and cons.

Day 1 - IId - Innovative Financing - SMyers (PDF)
,Meeting,Presentation
05-20-08

Region IV conference presentation on innovative transit financing.

Day 1 - IId - Innovative Financing - TBishop (PDF)
,Meeting,Presentation
05-15-08

Description of funding problems and innovative ways to increase funding for FTA projects.

Day 1 - IId - Innovative Financing - Volinski (PDF)
,Meeting,Presentation
05-20-08

Lessons learned in transit efficiencies, cost reductions, and revenue generation.

Day 1 - IIIa - Planning for a Transit Facility (PDF)
,Meeting,Presentation
05-20-08

Examines the federal requirements for various types of tranist facilities.

Day 1 - IIIb - FTA Grant Management and Reporting 101 (PDF)
,Meeting,Presentation
05-20-08

Grants managment 101 presentation.

Day 1 - IIIc - NS and SS Overview - Day (PDF)
,Meeting,Presentation
05-20-08

Overview of new starts and small starts programs beth day presentation.

Day 1 - IIId - MSAA - Atlanta (PDF)
,Meeting,Presentation
05-28-08

Atlant TMCC presentation.

Day 1 - IIId - MSAA - Louisville (PDF)
,Meeting,Presentation
05-20-08

Lousiville region: travel management coordination center.

Day 1 - IIId - MSAA - LSCOG (PDF)
,Meeting,Presentation
05-20-08

LSTMCC taskforce for better mobiltity.

Day 1 - IIId - MSAA - Orlando (PDF)
,Meeting,Presentation
05-20-08

MORETMCC presentation.

Day 1 - IIId - MSAA - Schilling (PDF)
,Meeting,Presentation
05-20-08

MSAA/UWR Initiatives and target agencies.

Day 1 - Intercity Bus Presentation (PDF)
,Meeting,Presentation
04-08-08

Intercity bus transit requirement presentation.

Day 1 - Lunch - ARRA - Kentucky (PDF)
,Meeting,Presentation
04-16-09

Kentucy ARRA project slection and continuing fund processes

Day 1 - Lunch - ARRA (PDF)
,Meeting,Presentation
04-16-09

FTA ARRA presentation and introduction

Day 1 - North Carolina Rural Vanpool Program (PDF)
,Meeting,Presentation
04-09-08

NC vanpool program presentation.

Day 1 - PM - FTA Tracking and Transferring Funding (PDF)
,Meeting,Presentation
04-16-09

Tracking and transferring funding presentation.

Day 1 - PM - Intercity Bus Consultation Letter (PDF)
,Meeting,Presentation
04-09-09

RIPTA letter confirming that the intercity bus needs are met.

Day 1 - PM - Intercity Bus Program (PDF)
,Meeting,Presentation
04-16-09

FTA intercity transit program overview.

Day 1 - State DOT Charlotte Meeting Overview (PDF)
,Meeting,Presentation
04-08-08

Charlotte state program team semi-annual meetingschedule and breakdown of events.

Day 2 - State Management Review Presentation (PDF)
,Meeting,Presentation
04-08-08

State oversight management review presentation.

Day 2 - Transit Facility Planning (PDF)
,Meeting,Presentation
04-08-08

Guidiance presentation for how to plan for a tansit facility using FTA funds.

Day 2 - AM - State Management Review and Oversight (PDF)
,Meeting,Presentation
04-16-09

State management review fiscal year 2008 and beyond.

Day 2 - AM - Civil Rights (PDF)
,Meeting,Presentation
04-16-09

FTA civil rights and ARRA 2009 programs presentation

Day 2 - AM - Connecting Communities (PDF)
,Meeting,Presentation
04-16-09

onnectiong communities and emergency reporting FTA region IV presnetation.

Day 2 - AM - FY 2009 Grant Making Procedures (PDF)
,Meeting,Presentation
04-16-09

Fiscal year 2009 grant making dealine and procedure recap.

Day 2 - AM - Grants Management (PDF)
,Meeting,Presentation
04-15-09

Grant mangement reporting and close outs.

Day 2 - Coordinated Planning - KYTC (PDF)
,Meeting,Presentation
04-08-08

Kentucky coordinated plan update FTA state programs meeting.

Day 2 - Coordinated Planning - SCDOT (PDF)
,Meeting,Presentation
04-08-08

A guide through the coordinated planning process.

Day 2 - Coordinated Planning Part II (PDF)
,Meeting,Presentation
04-08-08

Region IV coordinated planning presentation part 2

Day 2 - Grant Manangement Presentation (PDF)
,Meeting,Presentation
04-08-08

Grant management and close outs presentation.

Day 2 - IVa - Joint Planning Regs - Garland (PDF)
,Meeting,Presentation
05-18-08

Joint FHWA/FTA planning regulations final rule key requirements presentation.

Day 2 - IVb - Technical Capacity - Whyte (PDF)
,Meeting,Presentation
05-20-08

Presentation about expanding the technical capacity in FTA programs.

Day 2 - IVc - Small Starts Program - Day (PDF)
,Meeting,Presentation
05-20-08

Small and very small starts program beth day presentation.

Day 2 - IVd - University Research - Volinski (PDF)
,Meeting,Presentation
05-20-08

UTC universities and their purpose and role in urban transit research.

Day 2 - NTD Rural Reporting Presentation (PDF)
,Meeting,Presentation
04-08-08

Rural reporting national transit database presentation.

Day 2 - Time Management for FTA Grant Making Presentation (PDF)
,Meeting,Presentation
04-08-08

Time management for FTA grant making presentation.

Day 2 - Va - ARC Coordinated Planning (PDF)
,Meeting,Presentation
05-20-08

Planning PDF, designed for Region 4, specifically city of Atlanta.

Day 2 - Va - Coordinated Planning - Schilling (PDF)
,Presentation
04-20-08

FTA region IV conference coordinated planning session presentation.

Day 2 - Va - SCDOT Coordinated Planning (PDF)
,Meeting,Presentation
05-29-08

Grantee Conference Region 4: South Carolina

Day 2 - Vb - Oversight Programs - White (PDF)
,Meeting,Presentation
05-20-08

FTA oversight programs presentation.

Day 2 - Vc - University Transit - Anoka (PDF)
,Meeting,Presentation
05-20-08

University transit presentation.

Day 2 - Vc - University Transit - JLibby (PDF)
,Meeting,Presentation
05-29-08

University transportation systems presentation.

Day 2 - Vc - University Transit - RTS (PDF)
,Meeting,Presentation
05-20-08

UF RTS partnership presentation.

Day 2 - Vd - Going Green - APowell (PDF)
,Meeting,Presentation
Day 2 - Vd - Going Green - Martin (PDF)
,Meeting,Presentation
05-20-08

Public transit and sustainability presentation.

Day 2 - Vd - Going Green - Thomas Low Council Report VII (PDF)
,Meeting,Presentation
04-28-08

Study detailing the ways in which to go gren with urban transit.

Day 2 AM - Charter Final Rule (PDF)
,Guidelines,Presentation
05-20-08

Charter service final rule description and breakdown.

Day 2 PM - Transit Security and Emergency Preparedness (PDF)
,Presentation
05-20-08

Transit security and emergency preparedness overview presentation.

Day 3 - CCAM Panel - Schilling (PDF)
,Guidelines,Presentation
05-20-08

CCAM program breakdown presentation.

Day 3 - Mobility Management - Jim McLary (PDF)
,Presentation
05-20-08

Mobility managmeent presnetation.

Day 3 - Mobility Management - St. Johns County (PDF)
,Presentation
05-20-08

Mobility management presentation.

Day 3 - Mobility Management - TARC (PDF)
,Presentation
05-20-08

Transit Authority of River City: To explore transportation opportunities that enhance social, economic and environment of the Greater Louisville community

Day 3 - TeamWeb - Anoka (PDF)
,Meeting,Presentation
05-20-08

FTA team web presentation

Debt Service Reserve Pilot Program – September 2008 (MS Word)
,Policy Letter
09-23-08

Letter detailing the effectiveness of the debt service reserve pilot program.

Debt Service Reserve Pilot Program – September 2008 (PDF)
,Policy Letter
09-23-08

Letter detailing the effectiveness od the debt service reserve pilot program.

December 2008 Transit Research Update (MS Word)
,News Update
12-05-08

Transit research update detailing all the FTA research done in 2008.

December 2009 Transit Research and Industry News Update (PDF)
,News Update
01-15-10

Transit research update detailing the research done by FTA in 2009.

Demonstration of Enhanced Human Service Transportation Models: Phase 1 - System Development and Design: The Purchase Area Regional Travel Management Coordination Center (TMCC) (PDF)
,Report
03-23-09

This report provides a review of the policy, operations, technical design, and development of the Purchase Area fo TMCC for western Kentucky.

Demonstration of Enhanced Transportation Models: Phase I – System Development and Design (Atlanta, Georgia) (PDF)
,Report
04-29-09

Details about system development and design that will improve public transit.

Demonstration of Fischer-Tropsch Diesel Fuel in Cold Climates (PDF)
,Report
12-17-07

The potential use of ultra-clean Fischer-Tropsch (F-T) synthetic diesel fuel in cold-climate transit applications.

Desert Research Institute Air Quality Final Report (PDF)
,Report
05-24-07

Southern Nevada Air Quality Study

Detroit Department of Transportation (Detroit, MI) (MS Word)
,Report
10-17-05

Title VI compliance review of the DDOT.

Developing Effective Mass Transit Systems: Proceedings of the 5th International Workshop on Public Transportation (PDF)
,Meeting,Presentation
04-04-08

Description of various plans to improve mass tansit in Moscow.

Development of Requirement Specifications for Transit Frontal Collision Warning System 2 (MS Word)
,Report
08-10-05

Report On Understanding Transit Frontal Collisions

Development of Requirement Specifications for Transit Frontal Collision Warning System 3 (MS Word)
,Report
08-10-05

Continued from preceeding link.

Development of Requirement Specifications for Transit Frontal Collision Warning System 4 (MS Word)
,Report
08-10-05

Report wants to obtain feedback on four different DVI warning illumination methods and on where optimal warning threshold onsets should be set.

Development of Requirement Specifications for Transit Frontal Collision Warning System 5 (MS Word)
,Report
08-10-05

Continued from preceeding link.

Disadvantaged Business Enterprise Program Goal Setting Process (PowerPoint)
,Meeting,Presentation
03-23-06

How to determine what you need to do as a DBE receiving FTA funds.

Discussion Paper: The Characteristics of Accessible Bus Rapid Transit (MS Word)
,Report
03-28-07

A detailed look at the characteristics of BRT when accesability is applied.

Do you Want ot Build a Facililty with Federal Funds (PowerPoint)
,Meeting,Presentation
11-28-07

Presentation detailing planning procedures and requirements for buildings contructed with federal funds.

Draft Operating and Maintenance Costs Chapter (MS Word)
,Guidelines,Report
12-20-06

Breakdown of the operating and maintenance costs for FTA projects.

Durham Report (PDF)
,Report
02-02-06

Attachment to Individualized Marketing Demonstration Project Report.

East Tennessee Hydrogen Initiative - Chattanooga (PDF)
,Report
10-15-09

ETHI program report to advance the understanding and use of hydrogen in public transit.

EEO Compliance Reviews Final Report (MS Word)
,Report
07-25-08

Letter about EEO compliance documents for MBTA.

Electronic Fare Collection Options for Commuter Railroads (PDF)
,Report
09-30-09

Study detailing how EPS systems might be implemented fr commuter railroads.

Elements of Internal Controls - Preventing Fraud Waste and Abuse (PowerPoint)
,Meeting,Presentation
10-22-07

Presentation on preventing fraud, waste, and abuse in transit systems.

Embezzlement 101 (PowerPoint)
,Meeting,Presentation
11-02-07

Embezzlement 101 presentation.

Enclosure C-02-10 (PDF)
,Report
06-27-02

Regional train-the-trainer sessions locations and registration forms.

Endangered Species Act (ESA) Programmatic Biological Assessment (PBA) for Idaho and Oregon (PDF)
,Report
08-06-03

PBA for the FTA region X office.

Endangered Species Act (ESA) Programmatic Biological Assessment (PBA) for Washington (PDF)
,Report
08-06-03

Washington state PBA for FTA region X.

Evaluation of South Carolina’s Virtual Transit Enterprise (PDF)
,Report
10-14-05

Shared web-based technology helping transit providers and South Carolina DOT solve mutual problems.  

Evaluation of Transit Applications of Advanced Parking Management Systems (PDF)
,Report
06-11-08

Detailed breakdown of the parking measures taken to improve efficiency and their effectiveness.

Evaluation of Ultra-Clean Fischer-Tropsch Diesel Fuel in Transit Bus Applications (PDF)
,Report
04-08-10

Final report for the FT diesel fuel evaluation program.

Feasibility Study on the Use of Personal GPS Devices in Paratransit (PDF)
,Information Sheet,Report
05-27-09

Report detailing the pros and cons to GPS devices in paratransit.

February 2008 Transit Research Update (MS Word)
,News Update
02-26-08

Complete update for 2008 of all ongoing FTA programs and assignments.

Federal Transit Administration Cooperative Agreement, FTA C(11) October 1, 2004 (MS Word)
,Agreements
10-01-04

FTA c-11 agreement.

Federal Transit Administration Cooperative Agreement, FTA C-12, October 1, 2005 (MS Word)
,Agreements
10-01-05

FTA C-12 agreement.

Federal Transit Administration Cooperative Agreement, FTA C-13, October 1, 2006 (MS Word)
,Agreements
10-01-06

FTA C-13 agreement.

Federal Transit Administration Grant Agreement, FTA G(11) October 1, 2004 (MS Word)
,Agreements
10-01-04

FTA G-11 agreement.

Federal Transit Administration Grant Agreement, FTA G-12, October 1, 2005 (MS Word)
,Agreements
10-01-05

FTA G-12 agreement.

Federal Transit Administration Grant Agreement, FTA G-13, October 1, 2006 (MS Word)
,Agreements
10-01-06

FTA G-13 agreement.

Federal Transit Administration Master Agreement, FTA MA(11), October 1, 2004 (MS Word)
,Agreements
10-01-04

FTA master agreement revision 11.

Federal Transit Administration Master Agreement, FTA MA(12), October 1, 2005 (MS Word)
,Agreements
10-01-05

FTA master agreement revision 12.

Federal Transit Administration Master Agreement, FTA MA(13), October 1, 2006 (MS Word)
,Agreements
10-01-06

FTA master agreement revision 13.

Federal Transit Administration Master Agreement, FTA MA(9), October 1, 2002 (MS Word)
,Agreements
10-01-02

FTA master agreement revision 9.

Federal Transit Administration Supplemental Agreement, Attachment to FTA G-12, October 1, 2005 (MS Word)
,Agreements
11-07-05

FTA supplemental grant agreement.

Federal Transit Administration Supplemental Agreement, Attachment to FTA G-13, October 1, 2006 (MS Word)
,Agreements
10-06-05

FTA supplemental grant agreement.

Federal Transit Administration Supplemental Agreement, FTA S(11) October 1, 2004 (MS Word)
,Agreements
10-01-04

FTA supplemental agreement G-11.

Federal Transit Programs - Fiscal Year 2004 Requirements (MS Word)
,Agreements
10-15-03

FTA fiscal year 2004 certifications and assurances report.

Figure 1: Map of New Starts Projects with Pending and Full Funding Grant Agreements (PDF)
,Agreements
01-03-03

Pending and existing full funding grants agreements map.

Financial Management Oversight (PDF)
,Meeting,Presentation
04-18-07

FMO presentation.

Financial Review Lessons (PowerPoint)
,Meeting,Presentation
11-26-07

Financial management lessons learned presentation.

Fiscal Year 2008 (Budget Estimates) (PDF)
,Report
03-29-07

BUDGET ESTIMATES FISCAL YEAR 2008

FMO Seminar Workbook - Day One (PDF)
,Presentation,Workbook
04-19-07

Seattle FMO seminar presentation.

FMO Seminar Workbook - Day Two (PDF)
,Presentation,Workbook
04-19-07

Seattle FMO seminar presentation.

Fort Worth Transportation Authority (Fort Worth, TX) (MS Word)
,Report
03-01-05

Title VI compliance review of the FWTA.

FTA - New Start Risk Assessment Process (MS Word)
,Meeting,Presentation
05-18-05

FTA documentation about risk and risk assessment.

FTA - New Start Risk Assessment Process (PowerPoint)
,Meeting,Presentation
04-05-04

FTA presentation about risk and risk assessment.

FTA Annual Awards Program (PDF)
,Award or Honor
10-12-06

FTA successes in enhancing ridership award program criteria.

FTA Annual Performance Plan FY 2007 (Draft) First & Second Quarter Assessment (MS Word)
,Report
06-12-07

FTA draft assessment of fiscal year 2007 goals and values plan.

FTA Annual Performance Plan FY 2007 (MS Word)
,Annual Report
01-29-07

TAs outline of goals and core value improvements for fiscal year 2007.

FTA Construction Roundtable: AirTrain Presentation (MS Word)
,Meeting,Presentation
05-03-04

Report on AirTrain for JFK Airport

FTA Construction Roundtable: AirTrain Presentation (PowerPoint)
,Meeting,Presentation
05-03-04

Power Point Presentation on AirTrain For JFK Airport.

FTA Fiscal Year 2007 Requirements compared to Fiscal Year 2006 (MS Word)
,Agreements,Information Sheet
11-02-05

Fical year 2006 and 2007 comparison of grante agreements.

FTA National Fuel Cell Bus Program Projects (MS Word)
,Presentation
09-27-07

Consolidation of all fuel cell bus programs managed by the FTA.

FTA New Starts Project Development Process (PowerPoint)
,Meeting,Presentation
12-13-06

Detailed look at the development process for new starts projects.

FTA Region IV Conference Program (PDF)
,Meeting,Presentation
05-28-08

FTA Region IV 2008 Conference – “The Route to Success… Today and Beyond!”

FTA releases Audit of the Tri-State Oversight Committee and the Washington Metropolitan Area Transit Authority (PDF)
,Report
03-04-10

FTA audit of the tri-state oversight comittee and the WMATA.

FTA Research Requirements (PowerPoint)
,Meeting,Presentation
04-10-07

FTA research requirements presentation.

FTA Ridership Symposium Charlotte Presentation 052808 (PDF)
,Presentation
05-19-08

Ridership gains strategies presentation.

FTA Ridership Symposium Nashville 52808 (PDF)
,Presentation
05-28-08

FTA ridership symposium luncheon presentation on the Nashville MTA.

FTA Section of Transportation, Treasury, Housing and Urban Development, the Judiciary, the District of Columbia, and Independent Agencies Appropriations Act, 2006 (PDF)
,Appropriations Report,Legislation
08-14-06

FTA H.R. 3058 expense listing.

FTA State of Good Repair Summit Presentation (PDF)
,Presentation
08-01-08

FTA state of good repair presentation.

FY 2006 and 2007 Certifications & Assurances for Tribal Transit Program (MS Word)
,Agreements
05-10-07

2006-2007 Tribal Certifications and Assurances Document

FY 2006 Capital Program - New Starts Obligations, by Category for UZAs (Excel)
,Appropriations Report
10-01-06

Fiscal year 2006 capital progrm obligations.

FY 2006 Certs and Assurances (MS Word)
,Agreements
05-01-06

Fiscal year 2006 FTA certifications and assurances document.

FY 2008 Appendix A: Certifications and Assurances for FTA Assistance Programs (PDF)
,Agreements
10-25-07

Federal fiscal year 2008 certifications and assurances for FTA assistance programs.

FY 2009 – FY 2013 (PDF)
,Report
01-16-09

FTA multi-year research program plan.

FY 2010 Financial Management Oversight Seminar Overview (PDF)
,Oversight,Seminar
01-25-10

Description of the seminar purpose and who should attend as well as things that will be discussed.

FY 2010 FTA Program Updates and ARRA Phase II Presentation (PDF)
,Presentation,Proposal Profile,Report
11-06-09

FTA region IV fiscal year 2010 updates and ARRA phase II presentation.

FY 2010 Triennial Review Workshops Top Areas of Findings for FY2009 (PowerPoint)
,Report,Workshop
10-01-10

Fiscal year 2010 triennial review workshop top area findings of 2009 presentation.

FY 2011 Master Agreement (MS Word)
,Agreements
10-06-10

Tribal transit master agreement.

FY 2011 Master Agreement (PDF)
,Agreements
11-17-10

Tribal transit master agreement.

General Atomics Low Speed Maglev Technology Development Program (PDF)
,Report
05-26-05

Progress of the construction of a 120-meter long test track at General Atomics in San Diego, California.

Greater Richmond Transit Company (Richmond, VA) (MS Word)
,Report
02-14-05

Title VI compliance review of the GRTC.

Guaranteed Ride Home Programs (PDF)
,Report,Research Publication
05-19-06

A study report on guaranteed ride home programs detailing characteristics utiliation and cost.

Guidance for Transit Financial Plans (PDF)
,Report
06-29-00

Recommendations for a sound financial plan.

Heavy Rail (MS Word)
,Meeting,Presentation
05-04-04

HEAVY RAIL TRANSIT CAPITAL COST STUDY

Heavy Rail (PowerPoint)
,Meeting,Presentation
05-04-04

HEAVY RAIL TRANSIT CAPITAL COST STUDY

Highlights of FTA's Impact on Public Transportation (PDF)
,Report
09-16-09

FTA presentation on transportation development.

How to Prepare a Research Publication 2008 (MS Word)
,Guidelines,Report
05-13-08

Documentation detailing the way in which to prepare a research report for the FTA.

Hudson-Bergen Light Rail (PowerPoint)
,Meeting,Presentation
05-04-04

Construction Update: Hudson-Bergen Light Rail

Hydrogen and Fuel Cell Transit Bus Evaluations: A Joint Evaluation Plan of the U.S. Department of Energy and the Federal Transit Administration (PDF)
,Research Publication
05-15-08

Describes the hydrogen bus transit solution evaluations.

Independent Verification and Validation of Washington State Ferries' Wireless High Speed Data Project (PDF)
,Report
06-30-08

Washington state ferries WHSD project verification and validation report.

India Trip Report (PDF)
,Report
09-20-07

FTA mission to india report presentation.

Individualized Marketing Demonstration Program (PDF)
,Report
02-24-06

The IMDP is a pilot program developed to test the effects of individualized marketing on public transportation ridership trends.

Individualized Marketing Supplement (PDF)
,Report
02-08-06

Attachment to Individualized Marketing Demonstration Project Report.

Innovative Financing: Meeting the Needs for Capital (PDF)
,Presentation
05-19-08

Presentation describing various innovations for meeting the funding needs of a project.

Integrated Collision Warning System: Final Technical Report 2 (MS Word)
,Report
08-09-05

Continued from preceeding link.

Integrated Collision Warning System: Final Technical Report 3 (MS Word)
,Report
08-09-05

Continued from preceeding link.

Integrated Collision Warning System: Final Technical Report 4 (MS Word)
,Report
08-09-05

Continued from preceeding link.

Integrated Collision Warning System: Final Technical Report 5 (MS Word)
,Report
08-09-05

Continued from preceeding link.

Integrated Collision Warning System: Interface Control Document 1 (MS Word)
,Report
08-18-05

Description of how ICWS works and how it is implemented in transit systems. 

Integrated Collision Warning System: Interface Control Document 2 (MS Word)
,Report
08-18-05

Part 2 of the ICWS description.

Iowa DOT (Ames,IA) (MS Word)
,Report
09-01-06

Title VI compliance review of the IDPTOPT.

January - February 2009 Transit Research Update (MS Word)
,News Update
03-03-09

January - February 2009 transit research update for all FTA research projects.

January - February 2010 Transit Research and Industry News Update (PDF)
,News Update
03-03-10

January - February 2010 transit research and industry news update for the FTA.

January 2008 Transit Research Update (MS Word)
,News Update
02-11-08

FTA research update for all FTA projects.

Joint Development (PowerPoint)
,Meeting,Presentation
10-22-07

FTA joint Development Presentation.

July 2007 - Transit Research Update (MS Word)
,News Update
08-01-07

2007 Transit research update by region.

July 2008 Transit Research Update (MS Word)
,News Update
08-14-08

2008 FTA research update.

July 2009 Transit Research Update (MS Word)
,Report,Reports to Congress,Research Publication
08-05-09

2009 FTA reseach update.

June 2008 Transit Research Update (MS Word)
,News Update
07-16-08

2008 transit research update.

June 2009 Transit Research Update (MS Word)
,Report
06-24-09

2009 transit research update.

KY Medicaid Brokering FTA Atlanta (PDF)
,Meeting,Presentation
09-13-07

Kentucky human service transportation presentation.

Las Vegas Max Evaluation (MS Word)
,Report
12-01-06

Second evaluation of the Las Vegas MAX BRT project to determine the full effects of its implementation as the system matured.

Las Vegas MAX--BRT Demonstration Project (PDF)
,Report
08-30-05

Las Vega metropolitan area express BRT demonstration project.

Lessons for the U.S. Transit Industry (PowerPoint)
,Meeting,Presentation
03-19-07

Power Point Presentation on Transportation in South America

Letter from Dick Doyle (MS Word)
,Policy Letter
05-16-08

Dear  colleague letter and invitation to the FTA region 1 symposium on increasing ridership.

Litigating in the Dark FTA Roundtable (MS Word)
,Meeting,Presentation
05-04-04

Presentation on the WMATA 14th stree tunnel case.

Litigating in the Dark FTA Roundtable (PowerPoint)
,Meeting,Presentation
05-04-04

Presentation on the WMATA 14th street tunnel case.

Local Approaches: Birmingham MPO Presentation (PDF)
,Meeting,Presentation
03-23-07

presented by Darrell Howard

Louisiana Dept. of Transportation & Development (Baton Rouge, LA) (MS Word)
,Report
02-10-05

Title VI compliance review of the LADOTD.

Low Cost Carbon Fiber Technology Development for Carbon Fiber Composite Application: Phase I Final Report (PDF)
,Report
01-04-08

Low Cost Carbon Fiber Technology Development for Carbon Fiber Composite Applications

Low-Speed Urban Maglev Research Program - Lessons Learned (2009) (PDF)
,Report
05-08-09

Final report from the UML transit department focusing on lessons learned.

March 2008 Transit Research Update (MS Word)
,News Update
03-11-08

2008 transit research update.

March 2009 Transit Research Update (MS Word)
,News Update
04-02-09

2009 transit research update.

Marketing (PDF)
,Meeting,Presentation
02-15-07

Marketting presentation condensed slides.

Mass Transit Crashworthiness Statistical Data Analysis (PDF)
,Report,Research Publication
12-16-05

Federal Transit Administration-funded National Institute for Aviation Research research project to improve the crashworthiness of mass transit buses.

Massachusetts Bay Transportation Authority (Boston, MA) (MS Word)
,Report
04-05-06

Title VI compliance review of the MBTA.

May 2008 Transit Research Update (MS Word)
,News Update
05-01-08

2008 transit research update

May 2009 Transit Research Update (MS Word)
,Report
05-20-09

2009 transit research update.

Memorandum of Understanding (MOU) (PDF)
,Agreements
08-06-03

Memorandum of understanding among the FTA, FHWA, WSDOT, and ST.

Memorandum of Understanding (MS Word)
,Agreements
06-03-04

Environmental coordination and review among the federal partnerts of the FTFRNYC environmental review comitee.

Metro (St. Louis, MO) (MS Word)
,Report
01-01-04

Title VI compliance review of METRO st. louis

Metropolitan Planning Organizations (MS Word)
,Org Chart
08-02-03

Contact information for all metropolitan planning organizations.

Metropolitan Transportation Commission (San Francisco, CA) (MS Word)
,Report
02-10-05

Title VI environmental justice compliance review.

Miami Urban Partnership Agreement (UPA) Project Phase 1A – Transit Evaluation Report (PDF)
,Report
11-01-09

Miami UPA project Phase 1 report.

Minimizing Delays in Grant Application Submission and Helpful Tips in Grant Management (PowerPoint)
,Meeting,Presentation
10-22-07

Presentation on minimizing delays in grant application submisson.

Mississippi Statewide Coordinated Plan Approach (PDF)
,Meeting,Presentation
03-23-07

Presentation about the Mississippi approach to coordinated planning.

Model Orlando Regionally Efficient Travel Management Coordination Center (MORE-TMCC) Final Report (PDF)
,Report
12-03-08

MORE-TMCC phase 1 system technical report.

Montana DOT (Helena, MT) (MS Word)
,Report
10-01-05

Title VI compliance review of the MDT.

Montgomery Area Metropolitan Planning Organization (Montgomery, AL) (MS Word)
,Report
11-01-04

Title VI compliance review of the Montgomery MPO.

Moving Cooler: An Analysis of Transportation Strategies for Reducing Greenhouse Gas Emissions (PDF)
,Annual Report,Report,Research Publication
07-24-09

Executive summary detailing strategies for reducing greenhouse gas emissions.

Multi-Year Program Plan (FY 2008-2012) (PDF)
,Report,Research Publication
07-29-08

FTA multi year research program.

Multi-Year Program Plan (FY 2009-2013) (PDF)
,Research Publication
01-16-09

FTA multi year research program.

Multi-Year Program Plan (PDF)
,Report
10-31-06

FTA reasearch plan for fiscal years 2007 through 2011.

Multi-Year Research Program Plan Development (PowerPoint)
,Meeting,Presentation
11-28-07

Breakdown the MYPP what it is and what it does.

National SGR Assessment (PDF)
,Report
06-01-10

Report outlining the nation SGR among transit agencies.

National SGR Study (PDF)
,Annual Report
06-01-10

National transit agency assessment of the state of good repair.

NC Coordinated Planning -NCDOT (PDF)
,Meeting,Presentation
10-18-07

Presentation format bullets for the NCDOT coordinated transportation initiative.

New FTA Ridership Award Program (MS Word)
,Award or Honor,Information Sheet
10-16-06

New FTA redership award program.

New Grantee Package: 04 - New Tribal Grantee Letter (MS Word)
,Award or Honor,Information Sheet,Policy Letter
03-01-07

Steps needed to finalize FTA grant reception.

New Grantee Package: 06- Attachment B - FY 2007 Certifications and Assurances (MS Word)
,Agreements,Forms
03-01-07

Federal fiscal years 2006 and 2007 certifications and assurances for FTA.

New Grantee Package: 07 - Attachment C - Fiscal Year 2007 Tribal Transit Program Master Agreement (MS Word)
,Agreements
03-01-07

Oulines grant agreements authorized by 49 U.S.C. § 5311(c)(1).

New Grantee Package: 08 - Attachment D - Dear Collegue Letter for DUNS Number (MS Word)
,Policy Letter
03-01-07

Dun & Bradstreet Data Unviersal Numbering System (DUNS)

New Grantee Package: 11 - Attachment G - Electronic Clearinghouse Operation (ECHO) Web Registration Letter (MS Word)
,Forms,Instructions,Policy Letter
03-01-07

Announcement of the ECHO system and registration deadlines.

New Starts - Small Starts (PowerPoint)
,Presentation
10-22-07

New starts and small starts presentation.

New Starts Program Assessment Appendix A: Case Study Report (PowerPoint)
,Report
02-12-07

New starts program assessment presentation.

New Starts Program Assessment Appendix B: Assessment of Analogous Project Delivery Processes (PowerPoint)
,Meeting,Presentation
12-28-04

Assessment of the effectiveness of the new starts program.

New Starts Program Assessment Final Report (PowerPoint)
,Report
02-12-07

New Starts Program Assessment: Final Report  

New Starts: Before and After Studies Report -- September 2007 (PDF)
,Report
09-01-07

FTA report on new stats projects before and after.

New Starts: Before and After Studies Report – September 2008 (MS Word)
,Report
09-01-08

FTA report on new starts projects before and after.

New Starts: Before and After Studies Report – September 2008 (PDF)
,Report
09-01-08

Report detailing before and after studies of new starts projects.

New Starts: Before and After Studies Report (PDF)
,Report
08-27-06

Report on the legality of new starts projects before and after.

New Starts: Contractor Performance Assessment Report - August 2006 (PDF)
,Policy Letter
08-23-06

FTA's report adress contractor performance.

New Starts: Contractor Performance Assessment Report -- September 2007 (PDF)
,Report
09-01-07

Contracor performance assessment report.

New Starts: Contractor Performance Incentive Report - November 2006 (PDF)
,Report
11-21-06

Summary of the new starts incentives.

New York City Transit (New York, NY) (MS Word)
,Report
02-10-05

Title VI compliance review.

New York State DOT (Albany, NY) (MS Word)
,Report
11-01-04

Title VI compliance review of the NYSDOT.

Niagara Frontier Transportation Authority (Buffalo, NY) (MS Word)
,Report
08-01-05

Title VI compliance review of the NFTA.

NJT - Diesel Multiple Unit (MS Word)
,Meeting,Presentation
05-01-04

Presentation on diesel/electric multiple units.

NJT - Diesel Multiple Unit (PowerPoint)
,Meeting,Presentation
05-01-04

Presentation on diesel/Electric moltiple units.

Nonrail Vehicle Study Market Report (PDF)
,Report
01-19-06

FTA report on the public transit bus manufacturing industry.

November - December 2007 Transit Research Update (MS Word)
,News Update
01-16-08

Complete update for 2007 of all FTA research projects.

November 2008 Transit Research Update (MS Word)
,News Update
11-13-08

FTA 2008 transit research update.

November 2009 Transit Research and Industry News Update (PDF)
,News Update
12-07-09

FTA 2009 transit research update.

NVTC SmarTrip Report with graphics (MS Word)
,Report
02-06-07

Report detailing the rollout or project SmarTrip.

October 2007 - Transit Research Update (MS Word)
,News Update
11-21-07

FTA 2007 transit research update.

October 2008 Transit Research Update (MS Word)
,News Update
11-03-08

FTA 2008 transit research update.

October 2009 Transit Research and Industry News Update (PDF)
,News Update
11-10-09

FTA 2009 transit research update.

Operational Test for the Implementation of Advanced Technologies in Rural Transit Service (Final Report) (PDF)
,Report
04-28-09

Final evaluation and final report for the ECC.

Oregon Regional Intelligent Transportation Systems (ITS) Integration Program California Oregon Advanced Transportation System (COATS) Bi-State Rural Integration Program: Phase III Evaluation Report (MS Word)
,Report
08-09-07

Memo about Oregon regional ITS program.

Oregon Regional Intelligent Transportation Systems (ITS) Integration Program Final Close-out Report: Transit Buses as Traffic Probes (MS Word)
,Report
08-09-07

Oregon ITS intergrations program final report.

Organization Chart
,Org Chart
12-19-11

FTA contact flow chart.

Overview (PowerPoint)
,Meeting,Presentation
02-15-07

An Overview of Bus Rapid Transit (BRT) in the United States and Lessons Learned from South America

Overview of Proposed EJ Circular (PDF)
Overview of Proposed Title VI Circular (PDF)
Overview: FTA Research Programs (PowerPoint)
,Meeting,Presentation
04-17-07

Presentation breaking down the FTA research programs in each step.

Paragon Technology Group (PDF)
,Report
12-20-07

Paragon technology group breakdown of capabilities within the FTA.

Pedestrian and Transit-Friendly Design: A Primer for Smart Growth (PDF)
,Presentation,Report
08-05-99

Pedestrian friendly transit design manual prepared for Florida DOT, and published by American Planning Association.

Pittsburgh West Busway BRT Evaluation - April 2003 (PDF)
,Report
04-01-03

Evaluation of one of  FTA's BRT demonstration projects, Pittsburgh, PA's West Busway.

Policy and Planning as Public Choice (PDF)
01-01-99

Analysis of public policy functions of transit, economic benefits of transit, and public choice analysis of transit budgets, planning, and policy.

Preamble to the Certs (MS Word)
,Agreements
11-09-05

Annual assurances and certifications list.

Presentation #1 (PDF)
,Presentation
06-15-06

Travel forecasting for new starts presentation.

Presentation #2 (PDF)
,Presentation
06-15-06

Part 2 f the presentation on new stats projects.

Prior Year Unobligated Section 5309 New Start Allocations (Excel)
,Appropriations Report
10-01-05

Revised prior year unobligated section 5309 new starts allocations.

Profiles of 511 Traveler Information Services (2009) (MS Word)
,Guidelines,Report
06-23-09

511 infomration update for 2009 coverage and cost.

Profiles of 511 Traveler Information Services Update 2007 (MS Word)
,Report
08-22-07

Coverage and cost update for the 511 system.

Profiles of 511 Traveler Information Services Update 2008 (PDF)
,Report,Research Publication
07-10-08

511 information update on coverage and planning.

Program Rollout: Questions & Answers - June 28, 2007 (MS Word)
,Fact Sheet,Presentation
05-15-07

Section 5310 and JARC program rollout Q and A.

Purpose of Visits (PowerPoint)
,Meeting,Presentation
03-20-07

South America BRT Technical Tour February 2007

Rail Modernization Study Report (PDF)
,Report,Reports to Congress
04-27-09

Report to congress involving rail modernization.

Rail Modernization Study: Report to Congress (PDF)
,Report,Reports to Congress
04-27-09

Report to congress with results of a study on rail modernization.

Real-Time Bus Arrival Information Systems-Return on Investment Study (MS Word)
,Report
08-01-06

Real-time Bus Arrival Information Systems facilitate transit usage through both perceived and actual reductions in passenger waiting time.

Region 10 Organizational Chart
,Org Chart

Region 10 Organizational Chart

Region I Org Chart (MS Word)
,Org Chart
04-18-11

Region 1: Organization Chart.

Region IV Organizational Chart
,Org Chart

Region IV organizational flow chart.

Region IV State Program Meeting - Day 1 (PDF)
,Meeting,Presentation
09-13-07

FTA state programs meeting presentation.

Region IV State Program Meeting - Day 2 (PDF)
,Meeting,Presentation
09-14-07

FTA region IV state programs meeting.

Region IV State Programs Team Meeting Agenda - Atlanta, GA - April 2009 (PDF)
,Meeting,Presentation
04-15-09

FTA state programs meeting final agenda.

Regional Advisory No. 2008-01 (PDF)
,Information Sheet,Policy Letter
10-17-07

Dear colleague advisory letter.

Regional Advisory No. 2008-02 (PDF)
,Information Sheet,Policy Letter
10-17-07

Dear colleague advisory letter.

Regional Advisory No. 2008-05 (PDF)
,Information Sheet,Policy Letter,Region 1
01-28-08

Dear colleague advisory letter.

Regional Advisory No. 2008-06 (PDF)
,Information Sheet,Policy Letter,Region 1
04-22-08

Dear colleague advisory letter.

Regional Advisory No.. 2008-04 (PDF)
,Policy Letter
12-12-07

Dear colleague advisory letter.

Remote Infrared Audible Signage (RIAS) Pilot Program (PDF)
,Report
09-01-09

Evalutation report of RIAS pilot program.

Report on the Job Access and Reverse Commute (JARC) Program (MS Word)
,Reports to Congress
01-02-09

Transmission letter and report on the JARC FTA program.

Report on the Job Access and Reverse Commute (JARC) Program (PDF)
,Reports to Congress
01-02-09

Tramission letter and report on the JARC FTA program.

Report to Congress on Incentives in Federal Transit Formula Grant Programs – August 2008 (MS Word)
,Reports to Congress
08-01-08

Review of the studies and reports sent by FTA to Congress.

Report to Congress on Incentives in Federal Transit Formula Grant Programs – August 2008 (PDF)
,Reports to Congress
08-01-08

Review of the studies and reports sent by FTA to Congress.

Report to Congress on the Costs, Benefits and Efficiencies of Public Private Partnerships for Fixed Guideway Capital Projects - January 2008 (PDF)
,Reports to Congress
01-04-08

Report to congress on the costs, benefits,and efficiencies of public-private partnerships for fixed guideway capital projects.

Research Quality (PowerPoint)
,Meeting,Presentation
04-04-07

Deatils and guidlines on how to produce quality research.

Rich Passage Passenger Only Ferry Study – Phase 1 (PDF)
,Report
08-18-05

Evaluation of Passenger Only Ferries in Rich Passage

Ridership Enhancement Quick Study: Final Report (PDF)
,Report
10-13-05

Report on why certain ridership increase teniques do not always work in certain situations.

Rural ITS Guidebook: Technology in Rural Transit - Linking People With Their Community (PDF)
,Report
02-11-02

ITS technologies in rural tranit in order to help reconnect small communities.

Sacramento Report (PDF)
,Report
02-01-06

Individualized marketing demonstration project report for Sacremento.

SAFETEA-LU Environmental Review Process Final Guidance (MS Word)
,Report
02-09-07

SAFETEA-LU environmental review final guidance update.

SAFETEA-LU Guidelines & Coordinated Planning Guidance (PDF)
,Meeting,Presentation
03-23-07

Coordinated planning and united we ride workshop presentation.

Safety and Security Presentation (PDF)
,Presentation
09-13-07

FTA Safety and Security Programs

Sample Agreements: FY 2011 Master Agreement (PDF)
,Agreements
10-08-10

Sample FTA master agreement.

San Pablo BRT Project Evaluation (PDF)
,Report
06-01-06

San Pablo Rapid BRT evaluation.

Santa Clara Valley Transportation Authority (San Jose, CA) (MS Word)
,Report
09-22-06

Title VI fare increase compliance review of the Santa Clara VTA.

September 2007 - Transit Research Update (MS Word)
,News Update
10-01-07

2007 FTA transit research update.

September 2008 Transit Research Update (MS Word)
,News Update
10-08-08

2008 FTA transit research update.

September 2008 Transit Research Update (MS Word)
,News Update
09-30-08

September transit research update.

September 2009 Transit Research and Industry News Update (PDF)
,Report
10-07-09

2009 FTA transit research update.

Session 5a (PDF)
,Meeting,Presentation
10-09-07

FTA travel forecasting for new starts presentation.

Session 5b (PDF)
,Meeting,Presentation
10-09-07

Pathbuilder Calibration with Data on Ridership Patterns

Sessions 10-16 (PowerPoint)
,Meeting,Presentation
09-01-07

FTA presentation for session 10-16.

Sessions 1-4 (PDF)
,Meeting,Presentation
09-19-07

Travel Forecasting for New Starts

Sessions 6-9 (PowerPoint)
,Meeting,Presentation
09-04-07

FTA Requirements for New Starts Reporting

Shared Track (PDF)
,Report
09-22-05

FTA report on transit and frieght trains sharing tracks citing liability and insrance issues.

SharpRAIL: Evaluation of Mobile WiMAX and Intelligent Video for Enhanced Rail Transit Safety (PDF)
,Report
06-19-08

Documents th effects of usng wirless broadband tecnology to improve rail safety.

Small Starts Impact -- January 2006 (PDF)
,Policy Letter
08-23-06

Small starts impact asessment.

Small Urban & Rural Transit Center (PowerPoint)
,Meeting,Presentation
08-17-04

Plan to develope a center to adress the transit needs of people in urban and rural locations.

SMART -- Opportunities for Improving Ridership (PDF)
,Report
10-12-06

SMART FTA report on improving ridership.

Southeastern Pennsylvania Transportation Authority (Philadelphia, PA) (MS Word)
,Report
03-06-06

Title VI compliance review of the SEPTA.

State Program Guide: Administration and Oversight of FTA Grant Programs (PDF)
,Report
05-03-08

Administration and oversight of FTA grant programs guide.

Statewide Coordinated Plan: Alabama Regional Councils (PDF)
,Meeting,Presentation
03-23-07

Human services coordinated transit plan.

Strategic Research Plan (MS Word)
,Report
03-07-07

Outline and breakdown the FTA's stragetic research program.

Summary Report Phase III (PDF)
,Report
06-30-04

TPMS summary report phase III.

Summary Report Phases I and II (PDF)
,Report
02-28-02

FTA summary report on TPMS.

TCRP Report 95, Chapter 17: Transit Oriented Development (PDF)
,Report
04-24-03

Research report on transit oriented devlopment and the travelers response to it.

TEAM (PowerPoint)
,Presentation,Training
04-16-07

FTA team GUI presentation.

The Americans with Disabilities Act (PowerPoint)
,Meeting,Presentation
07-16-04

The Americans with Disabilities Act: Lessons Learned from FTA Compliance Reviews

The EmX Franklin Corridor: BRT Project Evaluation (PDF)
,Report
10-12-09

LTD BRT evaluation and expasion recommendation.

The History of Envision Utah (PDF)
,Presentation,Report
12-03-01

The role that transit-oriented development is playing in shaping the community and affecting economic growth.

The Role of State DOTs in Support of Transit-Oriented Development (PDF)
,Report
04-26-06

– Final Report of Task 20 of NCHRP Project 25-25, as requested by the AASHTO Standing Committee on the Environment.

Title Page and Table of Contents (PDF)
,Report
01-19-06

Title page and ToC for the non-rail vehicle market viabiltity study.

Title VI of the Civil Rights Acts of 1964 (PowerPoint)
,Meeting,Presentation
03-09-06

Title VI compliance guidance.

TRACS Transcript - (09/10/2010) (PDF)
,Transcript
09-10-10

TRACS Meeting transcript.

TRACS Transcript - (09/09/2010) (PDF)
,Transcript
09-09-10

TRACS meeting transcript.

Transit Asset Management Practices: A National and International Review (PDF)
,Annual Report
08-24-10

A national and international review of transit asset management practices.

Transit Benefits 2000 Working Papers (PDF)
,Report
09-07-00

FTA report on transit benefits.

Transit Bus Life Cycle Cost and Year 2007 Emissions Estimation (PDF)
,Report
07-23-07

2007 FTA transit bus emissions and life cycle analysis.

Transit Bus Life Cycle Cost Scenarios Based on Year 2008 and Future Fuel Prices (PDF)
,Report
11-03-08

Ancilliary transit bus life cycle and fuel cost analysis for current and future prices.

Transit Operations Decision Support System (TODSS) Core Requirements Evaluation and Update Recommendations Report (PDF)
,Report
04-06-10

TODSS core requirements evaluation and update recommendations.

Transit State of Good Repair -- Beginning The Dialogue (PDF)
,Report
10-08-08

Introduction to the SGR initiative.

Transmilenio (PowerPoint)
,Meeting,Presentation
03-15-07

TransMilenio: Transportation project in Colombia.

Transportation Economics (PDF)
,Report
08-18-07

Transportation economics capabilities statement.

Transportation Equity: Past, Present, and Future, Celebrating the Legacy of Rosa Parks and the Montgomery Bus Boycott (MS Word)
,Report
02-17-06

Equality in transit presentation.

Trends in the Flexible Fund Program Annual Status Report FY 2002 (MS Word)
,Report
10-01-02

Report deatiling trends in the FTA flexible fund program.

TRI-20 Overview (PowerPoint)
,Meeting,Presentation
05-15-08

FTA research programs presentation.

TRI-30 Overview (PowerPoint)
,Meeting,Presentation
12-09-98

Description of the Office of Research Management and its purpose.

Tribal Transit Program Master Agreement (MS Word)
,Agreements
06-21-06

FTA tribal transit program master agreement.

U.S. Transportation Secretary Ray LaHood Announces New Transit Rail Advisory Committee for Safety (MS Word)
,News Update,Rail Transit Vehicles and Systems,Safety
06-23-10

Panel is charged with laying the groundwork for drafting national safety measures for rail transit.

United We Ride Technical Assistance Tools (PDF)
,Presentation
03-23-07

FTA technical assistance workshop for the UWR program.

United We Ride/Mobility Services for All Americans Joint Demonstration (South Carolina) (PDF)
,Report
05-20-09

UWR/MSAA joint demonstration phase 1.

Useful Life of Transit Buses and Vans (PDF)
,Report
04-26-07

Report detailing the useful life of a Bus for FTA.

Utah Transit Authority (Salt Lake City, UT) (MS Word)
,Report
01-22-04

Title VI compliance Assessment of the UTA

UWR/MSAA Demonstration of Coordinated Human Service Transportation Models: Phase 1 - System Development and Design M-ITS: Mart's Integrated Traveler Services (Massachusetts) (PDF)
,Report
03-26-09

Fianl report for the UWR/MSAA demonstration of coordinated human service transit models.

Washington State Ferries Wireless Connection High-Speed Data Project (PDF)
,Report
07-09-09

WSF HSD project funded by FTA.

Washington State Ferries Wireless Connection Project Final Report (PDF)
,Report
05-31-05

Describes continuous high speed internet access on Washington State Ferries.

Webinar Presentation 1-16-07 (PDF)
,Presentation
01-16-07

Alternative transportation in parks and public lands presentation.

Wireless Connection Project Evaluation Report (MS Word)
,Report
05-31-05

Describes continuous high speed internet access on WSF.

Word Version (MS Word)
,Report
03-12-07

FTA 2007 apportionments and allocations program informaiton report.