What actions do State DOTs and MPOs need to take, in coordination with transit agencies to ensure timely award and expenditure of funds?
Update Planning Documents. States and MPOs, in coordination with transit agencies, should conduct the transportation planning activities necessary for adding proposed ARRA program projects to plans, TIPs and STIPs. Planning tasks such as conducting public involvement, demonstrating fiscal constraint, and performing travel model runs and analyses prerequisite to making transportation air quality conformity determinations should take place now. This is necessary to ensure timely amendment of the documents to include ARRA projects and to award funds as soon as possible. This work should have already begun. If it has not, it should be started immediately.
In identifying and proposing additional projects for amendment into TIPs and STIPs, it is reasonable to assume ARRA program funds equivalent to a doubling of the current full-year amount of comparable FTA program funds – Sections 5307 Urbanized Area Formula program, 5309 Fixed-Guideway Modernization program, and 5311 Non-Urbanized Area Formula program. FTA has not determined how New Starts Funding (49 U.S.C. 5309) will be allocated at this time. Once the necessary planning and air quality conformity work has been completed, MPOs and State DOTs may amend their plans, TIPs and STIPs. FTA, in coordination with FHWA, can make any necessary conformity findings on the amended plans and TIPs, and approve the STIP amendment requests.
Attainment and Nonattainment Conditions. If the project is in an area that is in attainment of air quality standards, the MPOs would take action and then submit the amended TIP to the State for incorporation into the STIP. The State would submit the amended STIP to FHWA/FTA for review and approval. With advance coordination among the parties, some of these items can be performed concurrently.
If the project is in an air quality nonattainment or maintenance area, the addition of activities or projects that are exempt from conformity could be accomplished as a simple amendment and would not necessitate a conformity determination. See List of Projects that are Exempt from Air Quality Conformity.
States and the MPOs should begin now to do the necessary planning work, such as model runs for the various scenarios; analysis work needed for conformity, if necessary; public involvement; and any other planning support work to get prepared. This preparatory technical work can be completed, and action taken to approve the necessary amendments along with conformity determination, if required.
Once the planning and any necessary conformity work has been completed, the MPO policy boards and State DOTs may amend their plans, TIPs and STIPs, and FTA, in coordination with FHWA, may make any necessary conformity determinations.
Projects with Incomplete Environmental Processes. A project for which a categorical exclusion or an environmental assessment is in the process of being prepared, but nearing completion, likely will qualify as a “quick-start” activity targeted for ARRA investment. A project for which an environmental impact statement is nearing completion may qualify as a quick-start activity if a record of decision is expected to be executed shortly. FTA staff will provide guidance on the most efficient course of action for completing the environmental process (including the National Environmental Policy Act (NEPA) process and other environmental requirements, such as section 106 of the National Historic Preservation Act and section 4(f) of the Department of Transportation Act, for any project that may qualify as a quick-start activity.
Can State DOTs and MPOs count the ARRA funds to demonstrate “fiscal constraint” in plans, TIPs, and STIPs?
Yes. Funds may be used to demonstrate fiscal constraint of plans, TIPs, and STIPs in areas that are in attainment, nonattainment, or maintenance of air quality standards. This special determination is analogous to the assumption of a continuing flow of Federal funds. Can State DOTs and MPOs substitute or replace ARRA funds for FTA funds in projects currently programmed in the TIP and STIP?
Yes. Funds may be used to advance projects that are in any current TIP and STIP. The re-programmed FTA funds must be used for another eligible project before the funds lapse. In contrast, grantees may not substitute ARRA funds for FTA funds that are currently obligated in a grant agreement. Also, because we need to segregate the funds being made available from ARRA legislation, you will need to apply for the ARRA funds in a new grant application.
Can substitution of ARRA funds for FTA funds on projects programmed in the TIP and STIP be handled administratively?
Yes, provided that the action involves only a change in the source of the funds. The adopted amendment procedures governing your specific State or region should be consulted to determine what actions are eligible as administrative amendments to the TIP or STIP.
Can ARRA funds be used to support non-federal projects not currently listed in plans, TIPs or STIPs?
Yes, provided that the non-federal projects are eligible activities for ARRA funding (i.e. capital assistance), that they can be amended into plans, TIPs, and STIPs, and were developed and/or implemented in compliance with applicable federal requirements such as the environmental review process required under NEPA, other environmental laws, and any additional applicable federal requirements.
Can MPOs and States process TIP and STIP amendments to add ARRA-funded projects as “lump-sum” amounts?
It depends. Yes, if the term "lump-sum" refers to a "package" of individually identified projects proposed for amendment into TIPs and STIPs. In addition, in accordance with 23 CFR Part 450, Final Rule on Statewide and Metropolitan Transportation Planning, projects that are not considered to be of appropriate scale for individual identification in the TIP and STIP may be grouped by function, work type, and/or geographic area using the applicable classifications under 23 CFR 771.117(c) and (d) and/or 40 CFR part 93. The adopted amendment procedures governing your specific state or region should be consulted for guidance as to "lump sum" amendments requirements. A "lump-sum" dollar figure without a list of individual projects or indication of overall project “group” would not provide sufficient information for MPOs, States, and FTA/FHWA to approve amendments of TIPs and STIPs or track the use of ARRA funds.
Can State DOTs and MPOs use ARRA funds to do transportation planning activities necessary to amend TIPs and STIPs in preparation for subsequent fund award?
Funding from the ARRA program is limited to capital program assistance, and transportation planning is not an eligible activity for the funds that will be made available to FTA. MPOs and States should utilize the planning funds programmed in existing Unified Planning Work Programs and State Planning and Research Programs to support their planning efforts.
Can FTA, jointly with FHWA, make conditional STIP approvals?
No. Conditional STIP approvals are not allowed under existing regulations. The planning regulations (23 CFR 450.218(b)) do allow FTA/FHWA to:
• Approve the entire STIP; • Approve the STIP subject to certain corrective actions being taken; or • Under special circumstances, approve a partial STIP covering only a portion of the State. However, if States and MPOs complete the steps detailed above, FTA/FHWA can approve the STIP amendments immediately.
What public review and comment activities do organizations need to undertake prior to receiving funds?
The public involvement and consultation provisions adopted and published by metropolitan and statewide transportation planning processes apply to planning and programming of projects supported with ARRA funds. The provisions outlined in MPO Participation Plans and documented public participation processes of States describe the locally agreed upon requirements for public review in the planning process, including the schedule and period of time for public input and comment that must be met. Additionally, public review and comment required by the environmental process must be undertaken.
TRANSIT AGENCY ACTIONS
What actions do transit agencies need to take before applying for funds?
Planning Process. Projects must be included in the approved Statewide Transportation Improvement Program (STIP) and, in urbanized areas, the metropolitan transportation plan (Plan) and Transportation Improvement Program (TIP). Transit agencies should be working within their metropolitan or statewide transportation planning processes to ensure that their priority projects are included in those documents and made ready for grant award. Therefore, FTA strongly encourages transit agencies to reach out to Metropolitan Planning Organizations (MPO) or State Departments of Transportation (State DOT) to begin work as soon as possible to ensure that public transportation projects are included in approved plans, TIPs and STIPs, so that the projects are ready and available to advance to grant award, and to begin expending funds, as soon as possible.
Environmental Review. Environmental requirements that apply to projects – the National Environmental Policy Act (NEPA) and Section 4f of the Department of Transportation Act, among others – must be met. Areas should consider prioritizing projects that qualify as categorical exclusions or have completed or nearly completed NEPA in order to meet the anticipated timeframes for obligation of funds in the new legislation. To the extent that other environmental requirements apply and have not been satisfied, grantees should begin consulting with managers of affected resources at the earliest opportunity.
Grant Application Preparations. Grantees should be working on drafting an application for funding, including developing a budget and milestones for key activities.
Can ARRA funds be used to substitute for money in an existing grant that has not been expended?
No. ARRA program funds cannot be used to replace funds already obligated in an existing FTA grant even if those funds have not been expended. ARRA funds can, however, be used to replace program funds identified in STIP and TIP but not yet awarded in a grant. Also, because FTA needs to segregate the funds being made available from ARRA legislation, agencies will need to apply for the ARRA funds in a new grant application.
Will FTA consider approving grants before completion of the environmental process?
As a general rule, FTA does not award program funds in a grant until the NEPA process and review have been completed. Grantees with projects in the final stages of NEPA review should contact the appropriate FTA regional office for direction.
|
|