Figure 92a
FLEXIBLE FUND OBLIGATIONS FOR TRANSIT PROJECTS BY PURPOSE AND BY PROGRAM
FY 1992 - 2002
All Programs
Motor_veh 27.1%, Equip 2.7%, Pssngr_fac 13.5%, Veh_fac 4.5%, Parking_fac 2.4%, New_serv 4.9%, Program 1.4%, Rail_vehs 6.5%, Rail_line 26.6%, Busway 2.1%, Other 8.3%
Interstate Substitution
(4.1% of Total)
Veh_fac 0.7 2.7%, Rail_line 66.3%, Other 0.1%
Section 5307 Urbanized Area Formula Program
(88.4% of Total)
Motor_veh 28.4%, Equip 3%, Pssngr_fac 12.5%, Veh_fac 4.8%, Parking_fac 2.6%, New_serv 5.3%, Program 1.6%, Rail_vehs 7.4%, Rail_line 27%, Busway 1.6%, Other 5.8%

Section 5311 Non-urbanized Area Formula Program
(2.4% of Total)
 Motor_veh 59.9%, Equip 3.1%, Pssngr_fac 9.7%, Veh_fac 7.1%, Parking_fac 1.2%, New_serv 8.7%, Program 0.3%, Busway 4.7%, Other 5.3%

Section 5310 Elderly / Persons with Disabilities Program
(3.2% of Total)
Motor_veh 15.5%, Equip 1.4%, Passgr_fac 0%, Veh_fac 0.4%, Other 82.7%
Section 5309 Capital Program
(1.8% of Total)
Pssngr_fac 49.6%, Busway 30.2%, Other 20.3%