Fixed Guideway Modernization Obligations, by Category for UZAs
TABLE 21 NOTE:
FY 2002 URBANIZED AREA FORMULA OBLIGATIONS FOR FIXED GUIDEWAY
Area
Rolling Stock Purchases
Rolling Stock Rehab
Rolling Stock Other
Rolling Stock Total
Transit-way Lines
Stations/ Terminals
Electrif., Power Distribution
Signals/ Communic.
Support & Equip. Facilities
Transit Enhance-ments
Other
Total
Percent of Total
Rank
Albany-Schenectady-Troy, NY
$0
$0
$0
$0
$0
$2,600,000
$0
$0
$0
$0
$0
$2,600,000
0.2
26
Atlanta, GA
0
0
0
0
0
0
0
0
447,412
160,000
16,865,156
17,472,568
1.3
12
Baltimore, MD
0
1,674,322
0
1,674,322
1,760,000
2,005,958
0
440,000
8,176,365
368,383
15,000,000
29,425,028
2.2
9
Boston, MA
0
0
0
0
0
300,000
0
17,860,000
0
540,118
960,000
19,660,118
1.5
11
Buffalo-Niagara Falls, NY
0
0
0
0
0
0
0
0
1,040,000
0
0
1,040,000
0.1
30
California
0
0
0
0
0
1,957,000
0
0
0
0
0
1,957,000
0.1
27
Chattanooga, TN-GA
0
24,000
0
24,000
220,000
20,000
0
0
0
0
0
264,000
0.0
34
Chicago, IL-IN
2,250,000
5,608,132
0
7,858,132
6,326,400
30,440,929
296,000
7,280,000
12,232,374
2,461,260
107,865,597
174,760,692
13.2
2
Cleveland, OH
0
0
0
0
0
0
0
0
200,000
184,000
0
384,000
0.0
32
Connecticut
0
15,560,091
0
15,560,091
0
3,280,000
7,880,000
4,108,800
0
0
0
30,828,891
2.3
8
Dallas-Ft. Worth, TX
0
0
0
0
0
0
0
1,600,000
0
0
0
1,600,000
0.1
28
Detroit, MI
0
80,000
0
80,000
0
0
0
0
0
0
0
80,000
0.0
36
Ft. Laud-Hllywd-Pmp Bch, FL
0
0
0
0
0
0
0
0
1,427,056
0
6,258,831
7,685,887
0.6
18
Georgia
0
0
0
0
0
2,766,970
0
0
0
0
13,999,768
16,766,738
1.3
13
Harrisburg, PA
0
0
0
0
0
0
0
0
0
0
1,398,160
1,398,160
0.1
29
Los Angeles, CA
0
0
0
0
2,766,000
10,363,000
0
2,963,984
0
0
0
16,092,984
1.2
14
Maine
0
0
0
0
0
0
0
0
164,000
0
0
164,000
0.0
35
Memphis, TN-AR-MS
96,000
0
0
96,000
160,000
0
0
0
56,000
0
0
312,000
0.0
33
Miami-Hialeah, FL
0
0
0
0
1,500,000
(1,265,169)
0
0
(331,840)
5,479
0
(91,530)
(0.0)
37
New York-NENJ (NJ)
0
0
0
0
1,000,000
0
0
0
2,730,000
1,500,000
33,490,000
38,720,000
2.9
7
New York-NENJ (NY)
179,592,622
0
0
179,592,622
127,940,100
52,644,100
5,000,000
93,358,100
45,699,900
5,500,000
400,400
510,135,222
38.7
1
Oxnard-Ventura, CA
0
0
0
0
3,500,000
1,239,420
0
0
0
0
0
4,739,420
0.4
19
Phildelphia, PA-NJ
0
0
0
0
21,301,053
29,330,981
1,300,000
6,200,000
9,780,000
78,963
27,580,449
95,571,446
7.2
4
Pittsburgh, PA
(400,000)
0
0
(400,000)
0
0
0
1,494,736
0
0
1,520,000
2,614,736
0.2
25
Portland-Vanc, OR-WA
0
0
0
0
0
0
0
0
0
0
12,659,695
12,659,695
1.0
15
Riverside-San Brnrdno, CA
0
144,417
0
144,417
3,438,022
7,342,547
0
23,018
556,878
0
0
11,504,882
0.9
16
Sacramento, CA
0
0
0
0
3,541,200
857,000
0
0
0
0
0
4,398,200
0.3
22
Salt Lake City, UT
0
125,000
0
125,000
0
0
0
0
0
0
4,495,500
4,620,500
0.4
20
San Diego, CA
0
2,617,329
0
2,617,329
3,501,022
0
977,600
24,000
1,243,243
0
1,386,600
9,749,794
0.7
17
San Francisco-Oakland, CA
0
14,577,000
0
14,577,000
16,562,675
17,816,650
6,504,666
32,686,364
28,937,689
3,363,877
14,898,155
135,347,076
10.3
3
San Jose, CA
0
1,334,000
0
1,334,000
13,274,396
4,237,265
0
2,740,743
7,250,000
0
0
28,836,404
2.2
10
Seattle, WA
0
0
0
0
0
2,102,197
0
0
0
1,069,930
0
3,172,127
0.2
24
South Bend-Mishawka, IN-MI
0
0
0
0
0
0
0
0
0
0
1,030,008
1,030,008
0.1
31
Tampa-St. Pete-Clrwtr, FL
0
0
0
0
0
0
0
0
0
0
4,200,000
4,200,000
0.3
23
Trenton, NJ-PA
0
0
0
0
0
0
0
0
0
0
4,455,000
4,455,000
0.3
21
Wash, DC-MD-VA
(965,208)
6,486,462
0
5,521,254
9,226,800
29,392,319
1,557,172
3,760,000
15,712,170
1,458,564
8,576,555
75,204,834
5.7
5
W. Plm Bch-Bca Rtn-Dlry, FL
0
0
0
0
33,440,959
0
0
0
0
66,415
16,925,520
50,432,894
3.8
6
TOTAL
$180,573,414
$48,230,753
$0
$228,804,167
$249,458,627
$197,431,167
$23,515,438
$174,539,745
$135,321,247
$16,756,989
$293,965,394
$1,319,792,774
100.0
Percent of Total
13.7
3.7
0.0
17.3
18.9
15.0
1.8
13.2
10.3
1.3
22.3
100.0
The "Other" category includes contingencies, real estate, administration, contracts, preventive maintenance.
Transit-way lines may include HOV and busways, in addition to rail lines. Station Stops / Terminals include fare collection equip, PNR, furniture, security equip. Support & Equip Facilities include administrative/maintenance facilities, storage facilities, computers, and other support equip. Electrif./Power Dist. Includes traction power, AC power lighting, substation distribution, vehicle locator systems. Signal/Communic. Includes train control / signal systems, communications systems, radios. Other includes contingencies, real estate, administration, contracts. Rolling Stock Purchases includes rail cars and spare parts. Rolling Stock Rehab includes rehabilitation and mid-life rebuild. Rolling Stock Other includes vehicle overhaul, lease, or design.

