Sealed Bids
Q. Does FTA require the grantee/owner to attend the bid opening of a prime contractor that is opening bids from subcontractors on a Design-Build project?
A. FTA policies do not require the grantee/owner to be present at the bid opening of a prime contractor's subcontract bids. It would be good public policy for the bid opening to be conducted in public with all bids documented in a public record. (Posted: March, 2013)

