| Table 1-D |
| Summary of FY 2002 New Starts Ratings |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Project Justification Rating |
|
Mobility Improvement Rating |
Mobility Improvements |
Environment Benefits Rating |
Environmental Benefits |
|
|
|
Annual Travel Time Savings (millions hours) |
Low Income Households within 1/2 Mile |
Annual Reduction in Greenhouse Gas Emissions (tons CO2) |
Annual Reduction in Regional Energy Consumption (million BTU's) |
EPA Classification |
| Phase and City (Project) |
|
|
|
|
|
|
|
|
| Final Design |
|
|
New Start Vs. |
New Start Vs. |
New Start Vs. |
Ozone |
Carbon Monoxide |
|
|
|
|
|
No-Build |
TSM |
|
|
No Build |
TSM |
No Build |
TSM |
|
|
| Chicago (North Central Corridor Commuter Rail) |
|
Medium |
|
Medium |
1.6 |
1.3 |
3,811 |
Medium |
9,433 |
4,166 |
123,963 |
54,964 |
severe |
attainment |
| Dallas-Ft. Worth (Trinity Railway Express- Phase II)** |
|
Not Rated |
|
Not Rated |
Not Rated |
Not Rated |
Not Rated |
Not Rated |
Not Rated |
Not Rated |
Not Rated |
Not Rated |
Not Rated |
Not Rated |
| Little Rock (River Rail Project) * |
|
Exempt |
|
N/A |
N/A |
N/A |
N/A |
N/A |
N/A |
N/A |
N/A |
N/A |
N/A |
N/A |
| Los Angeles-San Diego (LOSSAN Rail Corridor Imp. Project)* |
|
Exempt |
|
N/A |
N/A |
N/A |
N/A |
N/A |
N/A |
N/A |
N/A |
N/A |
N/A |
N/A |
| Miami (South Miami-Dade Busway Extension)* |
|
Exempt |
|
N/A |
N/A |
N/A |
N/A |
N/A |
N/A |
N/A |
N/A |
N/A |
N/A |
N/A |
| New Orleans (Canal Streetcar Spine) |
|
Medium-High |
|
Medium |
0.2 |
0.2 |
5,888 |
Medium |
1,749 |
635 |
20,595 |
2,270 |
attainment |
attainment |
| San Diego (Oceanside-Escondido Rail Project) |
|
Medium-High |
|
Medium-High |
1.4 |
0.7 |
1,706 |
Medium |
4,070 |
2,113 |
54,464 |
29,045 |
serious non-attainment |
moderate non-attainment |
| San Francisco (Third Street Light Rail Project Phase 1) |
|
Medium |
|
Medium |
2.4 |
0.0 |
5,988 |
Medium |
3,503 |
N/A |
[12,582] |
N/A |
maintenance |
attainment |
| Seattle (Central Link LRT MOS-2 and MOS-3)** |
|
Not Rated |
|
Not Rated |
N/A |
N/A |
N/A |
Not Rated |
N/A |
N/A |
N/A |
N/A |
maintenance |
maintenance |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| Preliminary Engineering |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| Austin (Light Rail Corridors) |
|
Medium |
|
Medium |
2.6 |
2.1 |
4,446 |
Medium |
2,295 |
278 |
1,575 |
27,941 |
attainment |
attainment |
| Charlotte (South Corridor Light Rail) |
|
Medium |
|
High |
5.3 |
4.9 |
5,716 |
High |
-46,966 |
-25,117 |
28,070 |
10,850 |
attainment |
attainment |
| Chicago (Ravenswood Line Expansion) |
|
High |
|
Medium-High |
2.7 |
0.0 |
11,544 |
High |
18,911 |
N/A |
235,320 |
N/A |
severe non-attainment |
attainment |
| Chicago (Union-Pacific West Line Extension) |
|
Medium |
|
Medium-High |
0.3 |
0.8 |
1 |
High |
14,390 |
10,624 |
188,315 |
138,867 |
severe non-attainment |
attainment |
| Cincinnati (I-71 Corridor LRT) |
|
Low-Medium |
|
Low-Medium |
1.6 |
0.8 |
18,882 |
Medium |
[4,360] |
1,969 |
[61,120] |
19,201 |
moderate non-attainment |
attainment |
| Cleveland (Euclid Corridor Transportation Project) |
|
Medium |
|
Medium-High |
1.0 |
N/A |
12,406 |
Medium |
8,481 |
N/A |
76,146 |
N/A |
maintenance |
moderate non-attainment |
| Girdwood, Alaska (Alaska Commuter Rail)* |
|
Exempt |
|
N/A |
N/A |
N/A |
N/A |
N/A |
N/A |
N/A |
N/A |
N/A |
N/A |
N/A |
| Hartford (New Britain-Hartford Busway) |
|
Medium |
|
Medium-High |
2.8 |
0.8 |
4,381 |
High |
12,158 |
9,086 |
160,084 |
119,449 |
serious non-attainment |
attainment |
| Houston (Downtown to Astrodome Corridor Light Rail) |
|
Medium |
|
Medium |
1.2 |
N/A |
2,031 |
High |
13,004 |
N/A |
82,867 |
N/A |
severe non-attainment |
attainment |
| Kansas City, Johnson County (I-35 Commuter Rail) * |
|
Exempt |
|
N/A |
N/A |
N/A |
N/A |
N/A |
N/A |
N/A |
N/A |
N/A |
N/A |
N/A |
| Las Vegas (Resort Corridor Fixed Guideway MOS) |
|
Medium-High |
|
Medium |
29.9 |
15.5 |
4,114 |
High |
27,716 |
35,332 |
284,354 |
424,237 |
attainment |
serious non-attainment |
| Los Angeles (Eastside Corridor LRT) |
|
Medium |
|
Medium |
0.4 |
0.2 |
5,343 |
High |
2,074 |
2,030 |
8,851 |
16,112 |
extreme non-attainment |
serious non-attainment |
| Los Angeles (San Fernando Valley East-West Transit Corridor) |
|
Medium |
|
Medium |
0.4 |
0.2 |
3,552 |
Medium |
4,261 |
2,332 |
6,688 |
12,841 |
extreme non-attainment |
serious non-attainment |
| Lowell, Massachussetts-Nashua, Hew Hampshire (Commuter Rail)* |
|
Exempt |
|
N/A |
N/A |
N/A |
N/A |
N/A |
N/A |
N/A |
N/A |
N/A |
N/A |
N/A |
| Maryland (MARC Commuter Rail Improvements)** |
|
Not Rated |
|
Not Rated |
N/A |
N/A |
N/A |
Not Rated |
N/A |
N/A |
N/A |
N/A |
severe non-attainment |
maintenance |
| Miami (North 27th Avenue Corridor) |
|
Medium |
|
Medium-High |
0.7 |
0.6 |
3,084 |
Medium |
[5,754] |
[1,028] |
73,661 |
13,439 |
maintenance |
attainment |
| Minneapolis (Northstar Corridor Commuter Rail) |
|
Medium |
|
Low-Medium |
1.0 |
[0.5] |
1,219 |
Medium |
10,860 |
11,828 |
143,247 |
154,427 |
attainment |
attainment |
| Nashville (East Corridor Commuter Rail Project) * |
|
Exempt |
|
N/A |
N/A |
N/A |
N/A |
N/A |
N/A |
N/A |
N/A |
N/A |
N/A |
N/A |
| New Orleans (Desire Corridor Streetcar) |
|
Medium |
|
Low-Medium |
0.1 |
0.1 |
2,088 |
Medium |
[170] |
[113] |
[6,008] |
[5,337] |
attainment |
attainment |
| New York (Long Island Rail Road East Side Access Project) |
|
Medium |
|
Medium |
7.4 |
5.7 |
3,681 |
High |
[80,261] |
[97,356] |
[1,305,826] |
[1,531,344] |
severe non-attainment |
moderate non-attainment |
| Orange County (The Centerline Rail Corridor) |
|
Medium |
|
Medium-High |
9.3 |
N/A |
17,506 |
Medium |
206,623 |
N/A |
249,326 |
N/A |
extreme non-attainment |
serious non-attainment |
| Phoenix (Central Phoenix/East Valley Corridor)** |
|
Not Rated |
|
Not Rated |
N/A |
N/A |
N/A |
Not Rated |
N/A |
N/A |
N/A |
N/A |
serious non-attainment |
serious non-attainment |
| Pittsburgh (North Shore Connector LRT) |
|
Medium |
|
Medium |
0.2 |
0.1 |
510 |
Medium |
15,416 |
133,161 |
23,956 |
[4,072] |
moderate non-attainment |
attainment |
| Raleigh (Regional Transit Plan Phase I Durham to Raleigh) |
|
Medium |
|
Medium |
5.7 |
4.0 |
1,325 |
High |
[6,896] |
[1,531] |
75,136 |
14,602 |
maintenance |
Maintenance |
| San Diego (Mid Coast Corridor Project) |
|
Medium-High |
|
Medium |
0.8 |
N/A |
258 |
High |
13,425 |
N/A |
175,016 |
N/A |
serious non-attainment |
moderate non-attainment |
| San Juan (Tren Urbano, Minillas Extension) |
|
Medium-High |
|
High |
33.8 |
0.9 |
4,349 |
Medium |
48,564 |
[4,538] |
488,977 |
[87,589] |
attainment |
attainment |
| Seattle (Everett to Seattle Commuter Rail)* |
|
Exempt |
|
N/A |
N/A |
N/A |
N/A |
N/A |
N/A |
N/A |
N/A |
N/A |
N/A |
N/A |
| Stamford (Urban Transitway and Intermodal Transportation Center) |
|
Medium |
|
High |
0.4 |
0.1 |
139 |
Medium |
8,929 |
N/A |
116,724 |
N/A |
attainment |
attainment |
| Tacoma (Lakewood-to-Tacoma Commuter Rail)* |
|
Exempt |
|
N/A |
N/A |
N/A |
N/A |
N/A |
N/A |
N/A |
N/A |
N/A |
N/A |
N/A |
| Washington County (Wilsonville to Beaverton Commuter Rail)* |
|
Exempt |
|
N/A |
N/A |
N/A |
N/A |
N/A |
N/A |
N/A |
N/A |
N/A |
N/A |
N/A |
| Washington DC (Dulles Corridor Rapid Transit) |
|
Medium |
|
Medium |
2.1 |
1.9 |
237 |
High |
1,712 |
10,890 |
59,723 |
68,820 |
serious non-attainment |
moderate non-attainment |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| * This project has not been rated; under §5309(e)(8)(A), proposed new starts projects requiring less than $25.00 million in §5309 new starts funding are exempt from the project evaluation and rating process required by §5309(e). |
| ** "Not Rated" indicates that sufficient information for a complete evaluation of this project was not available for this Report; for information on a specific project, see Appendix A. |
| "N/A" = Not Available |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|